My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />VALLEY STEEL WORKS, LLC <br />4530 Badger Pocket Rd <br />Ellensburg, WA 98926 <br />509-306-2119 <br />va1leysteelworks@,)gniail.com <br />I Name/Address I <br />Belsaas & Smith Construction <br />P.O. Box 926 <br />Ellensburg, WA 98926 <br />Estimate <br />Date <br />Estimate # <br />3/12/2025 <br />E24023 COPY <br />Project <br />24015 Transfer Station <br />Item <br />Description <br />Qty <br />Rate <br />Total <br />Material <br />Tube, Plate, Flat Bar <br />1 <br />63,864.45 <br />63,864.45 <br />7. Wear Bars <br />Fabrication <br />x 18 pcs <br />18 <br />16.00 <br />288.00 <br />Drafting <br />Shop Drawings To Be Billed Accordingly <br />40 <br />110.00 <br />4,400.00 <br />Note: <br />Quote includes above stated work, material and hours for <br />fabrication and install and onsite welding. Any and all <br />extra work per customer request to be billed accordingly. <br />Change orders to billed accordingly. Down payment to <br />cover material required to begin. <br />Change orders according to engineer's request and <br />material increase. <br />Quote includes material, fabrication, and installation. <br />50% deposit required to begin project. <br />Subtotal <br />Sales Tax (8.6%) <br />Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.