My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />VALLEY STEEL WORKS, LLC <br />Name / Address <br />Belsaas & Smith Construction <br />P.O. Box 926 <br />Ellensburg, WA 98926 <br />4530 Badger Pocket Rd <br />Ellensburg, WA 98926 <br />509-306-2119 <br />valleysteelworks(4 gmail. com <br />Estimate <br />Date <br />Estimate # <br />3/12/2025 <br />E24023 COPY <br />Project <br />24015 Transfer Station <br />Item <br />Description <br />Qty <br />}late <br />Total <br />Kittitas County Lower Valley Transfer Station <br />UPDATED <br />Fabrication <br />1. Scale house Awning Support Brackets <br />3 <br />125.00 <br />375.00 <br />Material <br />Tube, Flat Bar <br />1 <br />130.00 <br />130.00 <br />Powder Coating <br />Jet Black <br />2 <br />60.00 <br />120.00 <br />Fabrication <br />2. Scale house Columns, Primed <br />12 <br />125.00 <br />1,500.00 <br />Material <br />50 Tube, Base Pates, Connection Plates <br />1 <br />1,409.00 <br />1,409.00 <br />Fabrication <br />3. Stair Grab Rail Approx 20' <br />20 <br />55.00 <br />1,100.00 <br />Coatings <br />Galvanized <br />1 <br />650.00 <br />650.00 <br />Fabrication <br />4.Admin building House Columns, Primed <br />10 <br />125.00 <br />1,250.00 <br />Material <br />4x4 Tube, Base Plates <br />1 <br />1,415.00 <br />1,415.00 <br />5. Transfer Building Push Wall, (Bare Material, No <br />0.00 <br />0.00 <br />Finish) Steel framed wall, plate, angled top plate, armor <br />plate <br />Fabrication <br />Shop Fab <br />402 <br />125.00 <br />50,250.00 <br />Mobile Welding <br />Onsite Welding and fabrication <br />482 <br />185.00 <br />89,170.00 <br />Material <br />Tube, Plate, Flat Bar, Angle, Studs, Wear Plate Anchors, <br />1 <br />126,016.32 <br />126,016.32 <br />6. Transfer Building Hopper (Bare, No Finish) <br />0.00 <br />0.00 <br />Fabrication <br />Shop Fab <br />230 <br />125.00 <br />28,750.00 <br />Mobile Welding <br />Onsite Welding And Fabrication <br />295 <br />185.00 <br />54,575.00 <br />Quote includes material, fabrication, and installation. <br />50% deposit required to begin project. <br />Subtotal <br />Sales Tax (8.6%) <br />Total <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.