My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 3 - Communication Plan <br />Intended Recipient(s) <br />Communication <br />Method <br />Frequency <br />Detention center staff <br />Energy Management Plan <br />Email with link to EMP <br />Annually <br />access and updates <br />Detention center staff <br />Energy conservation tips and <br />Email and posted signage <br />Annually / As needed <br />system use instructions <br />in staff areas <br />New staff <br />Energy -efficient operations <br />Printed/electronic <br />Upon onboarding <br />orientation <br />onboarding packet <br />Facilities staff <br />Energy best practices and <br />In -person briefing or <br />Annually <br />system operation guidance <br />virtual meeting <br />Detention center <br />Energy performance review <br />Annual energy briefing <br />Annually <br />leadership <br />and feedback session <br />Staff -only areas <br />Quick -reference guides for <br />Printed materials in <br />Ongoing/ As needed <br />lightinVHVAC/window use <br />visible locations <br />TRAINING PLAN <br />The Energy Manager will oversee the development and implementation of a structured training <br />plan for all operations and maintenance (0&M) personnel. The goal is to ensure that staff are <br />equipped to operate building systems efficiently while maintaining indoor environmental quality <br />and system functionality. <br />Training will include: <br />-I- Energy -efficient operation of HVAC, lighting, and envelope systems <br />+ Proper use and adjustment of operable windows and exterior doors <br />+ Preventive maintenance procedures <br />+ Use of building automation systems (BAS) <br />-f- Safety protocols related to energy systems <br />Training will be delivered through a combination of in-house sessions, manufacturer -led <br />workshops, and external programs. Opportunities will be reviewed annually and updated as <br />needed. <br />Figure 4 - Training Plan <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.