My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seattle <br />1001 Alaskan Way Suite 200 <br />fcb Seattle, Was ington 92 6.622 8104 <br />3321 <br />■ — — I Spokane <br />ENGINEERS 505 W. Riverside Avenue Suite 440 <br />Spokane, Washington 99201 <br />509.215.1500 <br />Baltimore <br />4709 Harford Road <br />Memo Baltimore, Maryland 21214 <br />410.929.6894 <br />To Danny Duong, SCS Engineers <br />DDuong@scsengineers.com <br />From Faheem Gaballah, FSi Engineers <br />Fahmeemg@fsi-engineers.com <br />Project Kittitas Transfer Station 22091 <br />Subject Grounding for Bulk Storage Fuel Tanks at 08/21/2025 <br />MRW Building <br />This memo is intended to clarify the grounding requirement for bulk storage tanks per NFPA 70 <br />and NFPA 77 at the MRW (Moderate Risk Waste) building. <br />MRW: Bulking Tanks <br />The bulking tanks will be located on the northwest side of the building. The tanks are not attached <br />to the structure or to the floor, as shown in Figure 1, below. <br />The bulk storage tanks are portable (placed on the finished floor). The drums are filled once a <br />week. <br />I:\22091 Kittitas Transfer Station\Report\2025-08-21 Memo for Bulking Tanks - Rev.01\Memo - Grounding <br />for Bulking Tanks.docx 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.