Laserfiche WebLink
ENERGY ACCOUNTING <br />The Detention Center building is not meeting current EUI targets. However, as noted above, the <br />electrical system of the nearby Courthouse camnot carry the electrical load of the Courthouse <br />equipment, so the electricity to the Air Handling Units for the Courthouse is shown on the <br />Detention Center's meter and electric bills. Without submetering systems or replacing electrical <br />systems in the courthouse, a fully accurate energy accounting between the two buildings can't be <br />determined. The Detention Center, as a Tier 2 detention facility is not required yet to meet EUI <br />targets but is striving to reach them ahead of schedule. <br />The building's net energy is monitored and recorded in accordance with sections 5.1.2.2, 5.1.2.3 & <br />5.1.2.4. This table will gain additional rows as this document develops over time. <br />Table 4 - Energy Accounting <br />Figure 1 - Portfolio Manager Metrics Summary <br />Metrics Summary <br />Metric <br />ENERGY STAR Score (1-100) <br />Source EUI (kBt AI2) <br />Site EUI (1:510P) <br />Energ/ Cost (S) <br />Total itocation-Based; GHG <br />Emissions Intensity ft=el1ts) <br />Water Use iAll V.later Sources <br />(kgal) <br />Jun 2025 (Energy Jun 2025 (Energy <br />Baseline) Current) <br />Not Available Not Available <br />324.4 <br />136.2 <br />116-347.61 <br />10.4E <br />Not Available <br />324.4 <br />1362 <br />116 347.61 <br />10.48 <br />Not Available <br />Change <br />NIA <br />0.00 <br />(0 00%) <br />000 <br />(0.00% i <br />000 <br />i0 00%) <br />000 <br />(0-00%) <br />NIA <br />I <br />