My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY ACCOUNTING <br />The Detention Center building is not meeting current EUI targets. However, as noted above, the <br />electrical system of the nearby Courthouse camnot carry the electrical load of the Courthouse <br />equipment, so the electricity to the Air Handling Units for the Courthouse is shown on the <br />Detention Center's meter and electric bills. Without submetering systems or replacing electrical <br />systems in the courthouse, a fully accurate energy accounting between the two buildings can't be <br />determined. The Detention Center, as a Tier 2 detention facility is not required yet to meet EUI <br />targets but is striving to reach them ahead of schedule. <br />The building's net energy is monitored and recorded in accordance with sections 5.1.2.2, 5.1.2.3 & <br />5.1.2.4. This table will gain additional rows as this document develops over time. <br />Table 4 - Energy Accounting <br />Figure 1 - Portfolio Manager Metrics Summary <br />Metrics Summary <br />Metric <br />ENERGY STAR Score (1-100) <br />Source EUI (kBt AI2) <br />Site EUI (1:510P) <br />Energ/ Cost (S) <br />Total itocation-Based; GHG <br />Emissions Intensity ft=el1ts) <br />Water Use iAll V.later Sources <br />(kgal) <br />Jun 2025 (Energy Jun 2025 (Energy <br />Baseline) Current) <br />Not Available Not Available <br />324.4 <br />136.2 <br />116-347.61 <br />10.4E <br />Not Available <br />324.4 <br />1362 <br />116 347.61 <br />10.48 <br />Not Available <br />Change <br />NIA <br />0.00 <br />(0 00%) <br />000 <br />(0.00% i <br />000 <br />i0 00%) <br />000 <br />(0-00%) <br />NIA <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.