My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
03. March
>
2026-03-03 10:00 AM - Commissioners' Agenda
>
2026-01-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:46:28 PM
Creation date
2/26/2026 1:27:11 PM
Metadata
Fields
Template:
Meeting
Date
3/3/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
142099
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY ANALYSIS <br />Recommended energy efficiency measures (EEMs) were identified in the energy audit reports for <br />this building (See Appendix A). <br />EEMs should be implemented to ensure compliance with the standard. As a Tier 2 detention center, <br />this facility is not required yet to meet the EUIt, however, an energy audit has been conducted and <br />a list of EEMs to implemented is included below. In addition to the EEMs listed here, due to the <br />unusual configuration in which the Detention Center supplies electricity to some of the equipment <br />in the courthouse, implementing the EEMs recommended for the courthouse may improve <br />performance metrics for the Detention Center. <br />Table 3 - Energy Analysis <br />Useful Life <br />Suggested <br />of <br />•tal Project <br />TotalImplEEM <br />Measure <br />ementation <br />(yrs) <br />Cost <br />Savings <br />Date <br />Retro-commissioning <br />5 <br />$31,400 <br />94,357 <br />kWh/year <br />2026 <br />LED Replacement <br />15 <br />$66,250 <br />89,250 <br />kWh/year <br />2029-31 <br />Pump VFDs <br />15 <br />$18,125 <br />38,363 <br />kWh/year <br />2025 <br />Controls Upgrade <br />20 <br />$340,000 <br />238,477 <br />kWh/year <br />2028 29 <br />ENERGY MANAGER <br />The building owner has designated an energy manager (EM) to develop and maintain an energy <br />management plan for the building. <br />Energy Manager's name: Cody Cupp <br />Energy Manager's association with the building: Assistant Director of Facilities Maintenance <br />
The URL can be used to link to this page
Your browser does not support the video tag.