Laserfiche WebLink
Kittitas County Courthouse Energy Audit <br />w <br />1.0 EXECUTIVE SUMMARY <br />The courthouse, built in 1954, is approximately 43,728 square feet. Several energy conservation <br />measures (ECM) were identified for this facility. If implemented, these ECMs would reduce <br />annual electrical energy consumption by 33,019 kWh, natural gas by 1,635 cubic feet, and water <br />consumption by roughly 250,000 gallons. An estimated $12,200 would be saved in costs <br />annually. The simple payback period is estimated to be 30 years. <br />2.0 BUILDING INTRODUCTION <br />The primary purposes of the facility are split between court and administrative operations and <br />the detention center. The building consists of evidence and conference rooms; ranking officer <br />offices; holding cells, breakrooms; storage rooms; accounting, government licensing, and human <br />resources offices; courtrooms, city planning, and mechanical rooms. Figure 2-1 shows a floor <br />plan of the facility. <br />Figure 2-1 Courthouse First -Floor Plan <br />Project Number 22-084 6 <br />October 28, 2025 <br />