Laserfiche WebLink
ATTACHMENT,,A" <br />SCOPE OF WORK <br />The Contractor shall provide all labor, materials, equipment, supervision, coordination, and incidental services <br />necessary to properly install the Rodeo Arena Timed Event Pens in accordance with the accepted design, as shown <br />in Exhibit A, and any written clarifications or instructions issued by the Event Center Director following the original <br />bid posting. The Scope of Work includes, without limitation, all services, deliverables, representations, <br />commitments, and performance standards set forth in the Contractor's bid proposal. <br />The Contractor shall perform all installation work required to deliver a complete and fully functional Rodeo Arena <br />Timed Event Pen system, including, but not limited to, the following: <br />. Furnishing and installing all cattle panels, gates, hardware, anchoring systems, and accessories; <br />r lnstalling roping boxes, sorting systems, lead-up alleys, staging access gates, and related components; <br />o lntegrating all installed components with existing and newly constructed concrete walls, foundations, and <br />stadium structures as shown on the plans; <br />o The Contractor shall not anchor to or attach any materials to building structures without the <br />County's prior written aPProval; <br />. Performing field fitting, alignment, anchoring, and securing of all components in accordance with <br />ma nufactu rer req u irements a nd a pplica ble industry sta nda rds; <br />. Performing all incidental and ancillary work reasonably necessary to complete the installation, whether <br />or not such work is specifically identified in the plans. <br />The Contractor shall: <br />r Coordinate all work with the Event Center Director, acting on behalf of the County; <br />. Perform installation work only after the County has released the area for construction; <br />. Sequence and perform work to avoid interference with ongoing or previously coordinated construction <br />activities; <br />. Substantially complete all installation work no later than July L5, 2026, unless otherwise modified by <br />written amendment executed by the County. <br />The Contractor acknowledges and agrees that: <br />. No deviations from the approved design documents, including Exhibit A, shall be permitted without the <br />County's prior written authorization; <br />. Any discrepancies, errors, omissions, or constructability issues identified during installation shall be <br />promptly reported to the County, and the Contractor shall not proceed with affected work until written <br />direction is received. <br />All work performed under this Agreement is subject to inspection and approval by the County. The Contractor <br />shall promptly correct, replace, or re-install, at no additional cost to the County, any work determined to be <br />defective, incomplete, or not in compliance with the Contractor's bid proposal, this Agreement, or the Contract <br />Documents. No reduction in scope, substitution of materials or services, or deviation from the Contractor's bid <br />proposal shall be permitted without the County's prior written approval. <br />Final acceptance of the Work shall not relieve the Contractor of responsibility for latent defects, warranty <br />obligations, or other obligations arising under this Agreement. <br />All representations, warranties, schedules, pricing assumptions, inclusions, and commitments made by the <br />Contractor in its bid proposalare incorporated herein by reference and are enforceable as contractualobligations, <br />whether or not expressly restated in this Agreement. <br />Kittitas County Agreement for Services (rev. 5/14/251 <br />Page 3 of 18