My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.09.26 PW SS Briefings
>
Meetings
>
2026
>
02. February
>
2026-02-09 1:30 PM - Public Works Study Session
>
2.09.26 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 5:47:36 PM
Creation date
2/4/2026 4:48:26 PM
Metadata
Fields
Template:
Meeting
Date
2/9/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From Q4 2025 through Q2 2026, the effort turns to Olympia, where efforts will <br /> be made to pursue a state capital-budget earmark during the 2026 legislative <br /> session. While this legislative push is underway, the beginning momentum for <br /> TOTAL FUNDING FOR THE PUBLIC FACILITIES IMPROVEMENTS private fundraising will be started in the capital campaign. <br /> IS SECURED OR WILL BE SECURED WITHIN A GIVEN <br /> TIMEFRAME. Starting in Q1 2026 and running through Q2 2027, the quiet phase of the capital <br /> campaign will secure anchor gifts and naming rights, with a goal of achieving 40 <br /> percent of the private fundraising target before the public campaign is launched. <br /> Central Washington University is well positioned to leverage relationships <br /> developed over decades to mature the capital stacking plan to renovate Old In parallel, a second round of state advocacy will take place in Q3 2026 through <br /> Heat. CWU Business and Community Services (BCS) is a strategic economic Q2 2027, refining the request to complete the state's share of the project funding <br /> development services provider for the region and state. It is well positioned to during the 2027 legislative session.At the same time, a rolling grant calendar <br /> lead this effort in close collaboration with local government partners and non- begins in Q2 2026 and continues through Q4 2028 with the grant-writing <br /> profits. BCS actively develops and maintains relationships with businesses in consultant targeting $6-8 million from federal, state, and private foundation <br /> advanced manufacturing including the aerospace industry. There are investors sources. <br /> on the West side who have shown interest in Old Heat. There are medium <br /> and large businesses in the Central Washington region that may be interested The funding timeline is sequenced so that state appropriations, corporate and <br /> once plans are more developed. Current discussions with them are focused on private pledges, and grant awards are secured before the execution of the <br /> capstone projects and pilots. One large manufacturer has been looking for space construction contract, ensuring a fully financed project at notice-to-proceed. <br /> in Central Washington for years and ended up locating overseas due to lack of <br /> opportunities here. They are looking into coming back; Old Heat and Bowers Partners in Old Heat in its founding days will not be just passive support but <br /> Field might be just the space they are looking for. active investors of their time and resources to bring the project to fruition. <br /> Stakeholders see the project as a catalytic investment in the community and are <br /> Through these efforts a capital stacking plan can be developed to augment the ready to play a role in making it a reality—whether by giving, connecting, or <br /> financing of the Old Heat renovation. Sponsorship and naming rights are key leading. This collective enthusiasm provides a strong foundation for launching <br /> components of a capital stacking revenue plan. Relationships with industry and the capital campaign and signals a promising path forward. <br /> the regional community through CWU can establish prospect pipelines. <br /> A proposed timeline for these efforts on next page: <br /> The project launches in Q4 2025 with legislative briefings and the formation of <br /> an advisory board. During this phase, requests for proposals (RFPs)for both <br /> a capital campaign consultant and a grant-writing consultant can be issued if it <br /> is determined the work will not be performed by BCS or economic development <br /> staffing. This work could take on a hybrid structure utilizing contract work when <br /> needed. <br /> 52 1 Old Heat CERB Feasibility Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.