My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.09.26 PW SS Briefings
>
Meetings
>
2026
>
02. February
>
2026-02-09 1:30 PM - Public Works Study Session
>
2.09.26 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 5:47:36 PM
Creation date
2/4/2026 4:48:26 PM
Metadata
Fields
Template:
Meeting
Date
2/9/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION: <br /> Road Improvement Districts (RID) are authorized by RCW 36.88. This allows for <br /> improvement of county roads, or private roads that will become county maintained. The <br /> process to establish an RID includes a petition and public hearings. <br /> To establish a RID, a petition must be signed by owners of a majority of the area <br /> benefited by the proposed RID area. An alternative method for establishing a RID is the <br /> Board of County Commissioners can initiate the process. After a petition occurs, a <br /> preliminary cost estimate for design, right-of-way and construction would be developed. <br /> The estimated costs and request would then be presented to the BOCC at a public hearing <br /> for consideration. <br /> RID cost estimate usually consists of three components: Engineering (survey, design, <br /> permitting), Construction and Right-of-Way acquisition. The Engineering cost is initially <br /> paid by the Department of Public Works, with reimbursement coming through the final <br /> RID. <br /> The cost of road improvements through an RID is the responsibility of the property <br /> owners. Property owners within the district pay for the improvements through special <br /> assessments. Assessments can typically be paid in full within 30 days to avoid interest, <br /> or in installments over a set period(up to 20 years). <br /> FISCAL IMPACT: <br /> Improvements through RID are an assessment. Ongoing road maintenance become the <br /> cost of the road fund. <br /> ATTACHMENTS: <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.