Laserfiche WebLink
Project Name:COP-12R1 <br />Project No.1/27/2026 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 26 HR $106.95 2,780.70$ -$ -$ 2,780.70$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />100A 3P PDD23G0100 breaker 1 EA -$ $1,490.00 1,490.00$ -$ 1,490.00$ <br />100A 3pole MDPL provisions 1 LT -$ $300.00 300.00$ -$ 300.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />1.5" PVC 70 EA -$ $1.12 78.40$ -$ 78.40$ <br />1.5" PVC coupling 7 EA -$ $2.10 14.70$ -$ 14.70$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />#1 thwn 200 FT -$ $2.65 530.00$ -$ 530.00$ <br />#6 thwn 80 FT -$ $1.12 89.60$ -$ 89.60$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 2,780.70$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />2,780.70$ 2,502.70$ -$ 5,283.40$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments RFI-028 <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP 12 100amp feeder added rfi 28/Ellensburg Rodeo Arena COP-12 - CopyCost Breakdown Issued 1/27/2026