Laserfiche WebLink
The City has secured a STBG grant for the First Street and Oakes Avenue Resurfacing project. <br />The funding received from the STBG grant is S7!4,4t4 out of the 5825,912 needed for this <br />project. <br />2. Operations & Maintenance: Outline the plan for ongoing maintenance and operational <br />funding to ensure the infrastructure's long-term sustainability. <br />Since First Street and Oakes Avenue are a part of State Route 903, WSDOT will maintain the <br />roadway section. Ongoing maintenance will include routine crack sealing and chip sealing when <br />necessary. Each year WSDOT implements a maintenance budget to upkeep their existing <br />facilities, Routine crack sealing will extend the longevity of the newly resurfaced roadway. <br />lV. Project Timeline: Submit a comprehensive timeline detailing the project's current status and <br />key milestones, from initiation through completion. <br />Funds are currently being obligated for preliminary design work. Once funds have been <br />obligated, preliminary design work is anticipated to begin July 2025. Construction is anticipated <br />to begin April 2026. <br />End Construction <br />Begin Construction <br />Proiect Award <br />Bid Opening <br />Advertise for Bids <br />FinalSubmittal <br />Design Docu mentation Approva I <br />90% Submittal <br />60% Submittal <br />30% Submittal <br />Citv Contract Execution <br />06/2212026 <br />a4/L3/2026 <br />a3lLO/2026 <br />02/26/2026 <br />02los/2026 <br />ot10612026 <br />1-Lh9/202s <br />rLlts/202s <br />tolo7l2a25 <br />08122/ZA2s <br />0712212025 <br />V. Feasibility and Risk Management <br />1. Feasibility: Assess the project's feasibility, including any completed studies, readiness to <br />begin, and likelihood of completion within the proposed timeline. <br />The City has already begun obligating funds for the preliminary design phase. Once funds are <br />obligated, design work can begin. Some of the survey has been completed with the First Street <br />Downtown Revitalization project which will accelerate the design process. There are no <br />anticipated obstacles such as right-of-way acquisition or environmental documentation. The City <br />will be ready to obligate construction funds by spring 2026, following concurrence by WSDOf, as <br />required due to state route jurisdiction.