My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed R229
>
Meetings
>
2025
>
11. November
>
2025-11-18 10:00 AM - Commissioners' Agenda
>
Fully Executed R229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 11:04:58 AM
Creation date
1/13/2026 11:04:47 AM
Metadata
Fields
Template:
Meeting
Date
11/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for the 2025 Small Capital Projects Program - Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum for the First Street and Oakes Avenue Resurfacing Project
Order
11
Placement
Consent Agenda
Row ID
137941
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open in the completely revitalized area. Tourists will spend more time in the area as the newly <br />built walking paths will lead to more foot traffic and a newly resurfaced road will greatly <br />improve the driving experience. The completed downtown corridor will lead to significant <br />economic growth for the City and surrounding communities. <br />3. Stakeholders: ldentify all stakeholders supporting and/or benefitting from the project, <br />incl ud ing municipalities, d istricts, non profits, or private entities. <br />The City will partner with the Washington State Department of Transportation {WSDOT) for this <br />resudacing project. Since Oakes Avenue and First Street are a part of State Route 903, WSDOT <br />will be involved with design and construction review, with approvals required prior to bidding, <br />WSDOT is also in full support of this resurfacing project, as they have identified the need but are <br />unable to prioritize funding of the project at this current time. <br />lll. Budget and Funding: Provide a detailed project budget, including the total cost and a <br />breakdown of expenses by phase and/or major category. Specify which portions or phases the <br />grant will support. <br />The First Street and Oakes Avenue Resurfacing project is estimated to cost a total of 5825,972. <br />Preliminary engineering is estimated to cost 5106,590 with construction making up the <br />remaining Sltg,gZZ. Last year the City applied for a Surface Transportation Block Grant (STBG) <br />and received 57L4,4L4 in funding. The City is applying for the remaining 5111,498 in funding <br />needed to complete this project, as required by the STBG local match requirements. The grant <br />will support the remaining 514,390 needed in preliminary engineering and 597,108 in <br />construction costs. <br />Total Funding <br />Construction <br />Preliminary <br />Engineering <br />Project <br />57t+,+ta <br />5622,zr4 <br />592,200 <br />Secured STBG <br />Funding <br />Sttt,qgg <br />S97,108 <br />$14,390 <br />Current Funding <br />Request <br />$8zs,gtz <br />57t9,322 <br />S10G,590 <br />Total Project <br />Cost <br />1. Funding Sources: List all additional funding sources (e.g., grants, private partnerships, in-kind <br />contributions) and their current status {e.g-, secured, pending, or proposed).
The URL can be used to link to this page
Your browser does not support the video tag.