My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasability Study - C
>
Meetings
>
2025
>
11. November
>
2025-11-04 10:00 AM - Commissioners' Agenda
>
Feasability Study - C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2026 10:03:56 AM
Creation date
1/13/2026 10:03:05 AM
Metadata
Fields
Template:
Meeting
Date
11/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve the Kittitas County Public Health & Safety Building Feasibility Study
Order
3
Placement
Consent Agenda
Row ID
137354
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Coordination Center <br />PORTLAND, OR <br />The Emergency Coordination Center is a critical public building <br />that allows the City of Portland to provide continuity of opera- <br />tion and management during an emergency. This 30,000 SF <br />LEED Gold facility is designed to meet Essential Facility stan- <br />dards and provides flexible office, training, and coordination <br />space for a number of the City's emergency management and <br />security entities. lt can also be used as a temporary location for <br />the City Council. <br />Most importantly, the ECC reflects the values and commitment <br />of the City to its citizens. An intense land use process engaged <br />the public in neighborhood meetings. MWA supported this <br />outreach effort by gathering feedback from architectural and <br />landscape preference surveys and producing 3D visuals to <br />allow the public to envision this project. <br />The nature of the building requires it to have a high level of self- <br />sufficiency, allowing for immediate operation during emergency <br />situations. Onsite resources are integrated into the design to <br />enable the facility to operate in a 'stand alone' condition if utili- <br />ties, communication, and other infrastructure are not <br />available. <br />The ECC was designed with efforts to maximize passive and <br />sustainable strategies for building operation while minimizing <br />its impact on local natural processes. lnterior daylighting and <br />efficient insulation design reduce operating costs and the need <br />to rely on off-site resources. Extensive landscaping and 100% <br />onsite stormwater infiltration promotes efficient water <br />management, reduces heat-island effect, and presents a refined <br />appearance to both the nelghbors and adjacent public park. <br />KEY FEATURES <br />) MWA coordinated the needs of multiple stakeholders <br />> Essential facility providing emergency management and <br />high security <br />> Rainwater harvesting, native low-water landscaping, onsite <br />stormwater inf iltration <br />PROJECT INFORMATION <br />Project Team: MWA Architects <br />Project Type: Emergency Coordination Center <br />Size:30,000 SF <br />Sustainable Elements: LEED Gold <br />Client: City of Portland <br />B i,lr,VA ,rRaH TEaTS
The URL can be used to link to this page
Your browser does not support the video tag.