My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-08-minutes-public-works-study-session
>
Meetings
>
2026
>
01. January
>
2026-01-06 10:00 AM - Commissioners' Agenda
>
2025-12-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/1/2026 11:57:21 AM
Creation date
1/1/2026 11:40:23 AM
Metadata
Fields
Template:
Meeting
Date
1/6/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
139564
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FAL <br />State of Washington <br />Agreement No-. <br />Project Title - <br />Recipient Name - <br />Department of Ecology <br />SEAFBD-2527-KlCPWD-00022 <br />Upper Yakima River Floodplain and Habitat Restoration Implementation <br />Kittitas County - Public Works Department <br />Recipient Task Coordinator. Arden Thomas <br />3. Project Construction <br />Deliverables <br />Page 10 of 24 <br />Number <br />Description <br />Due Date <br />3.1 <br />Signed consultant contract(s) for construction, construction management, <br />and habitat restoration. Upload to EAGL and notify ECOLOGY Project <br />Manager by email. <br />3.2 <br />Final construction-ready design drawings, plans', and specifications, <br />stamped by a Washington state -licensed engineer. Upload to EAGL and <br />notify ECOLOGY Project Manager by email. <br />3.3 <br />Copy of construction schedule. Upload to EAGL and notify the <br />ECOLOGY Project Manager by email. <br />3.4 <br />As -constructed as -built plan set sealed/stamped by the project engineer, <br />noting any changes from the construction plan set. Upload to EAGL and <br />noti ECOLOGY Proj*ect Manager by email. <br />3.5 <br />Summary report with annotated digital photographs of the project before. <br />during, and after construction, with dates and key features labeled. <br />Upload to EAGL and notif, ECOLOGY Project Manager by email. <br />36 <br />GIS shapefile of subject area(s). Email to ECOLOGY Project Manager. <br />Template Version 12/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.