Laserfiche WebLink
Project Name:COP-1 <br />Project No.11/19/2025 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 6 HR $106.95 641.70$ -$ -$ 641.70$ <br />Foreman Labor 7 HR $117.14 819.98$ -$ -$ 819.98$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Plastic Handhole 1 EA -$ $100.02 100.02$ -$ 100.02$ <br />Fiber Optic Cable 1 LT -$ $972.97 972.97$ -$ 972.97$ <br />Supports 1 LT -$ $10.00 10.00$ -$ 10.00$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 1,461.68$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />1,461.68$ 1,082.99$ -$ 2,544.67$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/COP1 Fiber/Ellensburg Rodeo Arena Improvements COP-1 Temp FiberCost Breakdown Issued 11/20/2025