Laserfiche WebLink
Project Name:COP-2 <br />Project No.11/19/2025 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 5 HR $106.95 534.75$ -$ -$ 534.75$ <br />Foreman Labor HR $117.14 -$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />12x12x6 Nema3R Jbox 1 EA -$ $144.74 144.74$ -$ 144.74$ <br />Single gang W/P cover 2 EA -$ $17.94 35.88$ -$ 35.88$ <br />Shallow strut 10 FT -$ $2.43 24.30$ -$ 24.30$ <br />2" pvc fttings 1 LT -$ $4.62 4.62$ -$ 4.62$ <br />1.25" pvc fittings 1 LT -$ $2.41 2.41$ -$ 2.41$ <br />1" pvc fittings 1 LT -$ $10.06 10.06$ -$ 10.06$ <br />ground lug 1 EA -$ $3.03 3.03$ -$ 3.03$ <br />hardware 1 LT -$ $15.50 15.50$ -$ 15.50$ <br />terminations - W/P 1 LT -$ $70.93 70.93$ -$ 70.93$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 534.75$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />534.75$ 311.47$ -$ 846.22$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/RFI 002 RV Jbox/Ellensburg Rodeo Arena COP-2Cost Breakdown Issued 11/20/2025