My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-009_ Ellensburg Rodeo_Change Order 01
>
Meetings
>
2025
>
12. December
>
2025-12-16 10:00 AM - Commissioners' Agenda
>
2025-009_ Ellensburg Rodeo_Change Order 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 12:31:25 PM
Creation date
12/12/2025 12:31:03 PM
Metadata
Fields
Template:
Meeting
Date
12/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 1 with Cascade Central Construction for the Grandstands Project
Order
9
Placement
Consent Agenda
Row ID
139120
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name:COP-2 <br />Project No.11/19/2025 <br />Contractor: <br /> Unit Labor Material Equipment Total <br />Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Electrician Labor 5 HR $106.95 534.75$ -$ -$ 534.75$ <br />Foreman Labor HR $117.14 -$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />12x12x6 Nema3R Jbox 1 EA -$ $144.74 144.74$ -$ 144.74$ <br />Single gang W/P cover 2 EA -$ $17.94 35.88$ -$ 35.88$ <br />Shallow strut 10 FT -$ $2.43 24.30$ -$ 24.30$ <br />2" pvc fttings 1 LT -$ $4.62 4.62$ -$ 4.62$ <br />1.25" pvc fittings 1 LT -$ $2.41 2.41$ -$ 2.41$ <br />1" pvc fittings 1 LT -$ $10.06 10.06$ -$ 10.06$ <br />ground lug 1 EA -$ $3.03 3.03$ -$ 3.03$ <br />hardware 1 LT -$ $15.50 15.50$ -$ 15.50$ <br />terminations - W/P 1 LT -$ $70.93 70.93$ -$ 70.93$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />Labor Subtotal 534.75$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />-$ -$ -$ -$ <br />534.75$ 311.47$ -$ 846.22$ Subtotal Cost of Work <br />Ellensburg Rodeo Arena Improvments <br /> Cost Breakdown <br />McGann Electric <br />2/1/2017 <br />Contractor Ref. No. <br />Date: <br />https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann Electric/2025 Ellensburg Rodeo 9.30/COPs/RFI 002 RV Jbox/Ellensburg Rodeo Arena COP-2Cost Breakdown Issued 11/20/2025
The URL can be used to link to this page
Your browser does not support the video tag.