My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Conduct PHearing_Non-Exclusive Franchise_Level 3
>
Meetings
>
2025
>
11. November
>
2025-11-18 2:00 PM - 2:00pm Public Hearing
>
Conduct PHearing_Non-Exclusive Franchise_Level 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 1:03:29 PM
Creation date
11/13/2025 1:01:45 PM
Metadata
Fields
Template:
Meeting
Date
11/18/2025
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider a Non-Exclusive Franchise for Telecommunications Facility with Level 3 Communications, LLC in Kittitas County.
Order
1
Placement
2:00pm Public Hearing
Row ID
137949
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />FIBER OPTIC ROUTE AND CONSTRUCTION TECHNIQUES <br />(See Attached) <br />The parties recognize that the construction techniques and locations listed in this Exhibit are the <br />presumed techniques and locations for LEVEL 3's construction in the COUNTY, based upon LEVEL3's <br />investigation of the route. However, the techniques and locations are subject to change in the event that <br />LEVEL 3 determines that any of said techniques are impossible or impractical at any location along the <br />proposed route. By illustration, some examples of situations where the techniques may be altered are as <br />follows: <br />• Conflicts with existing utility facilities (either longitudinal or traverse to the running line) <br />• Poor subsurface ground conditions <br />• Conflicts with drainage structures or other facilities to be avoided or preserved <br />• Poor surface water conditions at the time of construction <br />• Permit restrictions from relevant monitoring agencies (i.e. wetland/habitat) <br />In the event that LEVEL 3 must utilize different construction techniques or install its facilities in different <br />locations than those identified in this Exhibit, it will promptly notify the Director of Public Works (or his <br />designee) for approval, which will not be unreasonably withheld or delayed. <br />FRANCHISE PAGE 8 OF 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.