Laserfiche WebLink
. Preparation of permit applications and supporting technical documentation <br />e Coordination with Ecology and other agencies for necessary approvals. <br />o Construction management and contractor support through implementation <br />Subtasle 5.3 * Leachate Poncls anrl Septage Lagoons <br />Activities <br />Activities may include, but are not limited to <br />r Reclassification of a leachate pond into a septage lagoon. <br />. Liner leak detection, evaluation, and repair. <br />r Sediment sampling, cleanout planning, and waste management support. <br />o Preparation of technical reports and permit applications. <br />. Coordination with Ecology and other regulatory agencies. <br />. Engineering and construction support to address operational, structural, or compliance issues <br />Other On-call Services <br />Represe ntative Activity Categories <br />The following categories illustrate the types of work that may be performed under Task 4.0. This list is not <br />exhaustive, and additional activities may be added during the contract term as authorized by the County: <br />Regulatory and Permitting Support - Non-routine permit coordination with Ecology or other agencies; <br />supplemental documentation for new or revised regulatory requirements; support for major operational <br />changes. <br />Closure and Post-Closure Plan Updates (Non-Annual) - Revisions outside the recurring annual reviews in <br />Tasks 1.0 and 3.0, such as plan modifications triggered by grading or footprint changes, evolving <br />regulatory conditions, groundwater status changes, or early closure phases; preparation of end-of- <br />program documentation or closure memoranda for the SSLAP or SELs if the treated septage program is <br />retired. <br />Monitoring Program Adjustments - Evaluations or revisions to monitoring networks or plans in response <br />to regulatory exceedances, new wells, or other evolving site conditions' <br />Septage Faciliry / SEL Technical Support - Technical assistance for SEL operations outside the scope of <br />annual Land Application Event planning, such as capacity evaluations, data review, and preparation of <br />technical memoranda or agency responses. <br />Public Outreach and Stakeholder Coordination * Development of public information materials, <br />presentationt or other communications to address stakeholder concerns or demonstrate regulatory <br />compliance. <br />Deliverables <br />. Deliverables will be determined on a per-authorization basis and will vary depending on the nature of <br />the task. <br />Kittitas County Agreement for Service s (rev. 5/L4125) <br />Page 11 of 28 <br />a <br />a <br />a <br />a <br />a