My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Document (4)
>
Meetings
>
2025
>
10. October
>
2025-10-21 10:00 AM - Commissioners' Agenda
>
Fully Executed Document (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2025 8:59:51 AM
Creation date
10/31/2025 8:59:32 AM
Metadata
Fields
Template:
Meeting
Date
10/21/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve an Agreement for Services between Kittitas County and Parametrix
Order
5
Placement
Consent Agenda
Row ID
136877
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions <br />o Soil sampling and laboratory anaiysis will be performed and paid for directly by the County through their <br />selected contractor and laboratory. <br />. Rangeland specialist services wil! be provided under this contract as a Parametrix subcontractor. <br />r Application events willfollow the approved SSLAP procedures unless Ecotogy requires modifications- <br />r Parametrix is not responsible for field application oversight or contractor performance. <br />r Routine SEL inspections, maintenance, freeboard checks, lysimeter monitoring, sediment sampling, and <br />recordkeeping are performed by the County and are not included in this task. <br />o Any SEL technical support beyond the scope of Land Application Event planning will be addressed under <br />Task 4.0 - Necessary On-Call Civil Engineering and Environmental Design Services or as a separate task, <br />at the County's discretion. <br />. This task covers work performed under the 2025 Ecology General Permit for Biosolids Management and <br />associated SSLAP approval. Any scope required to implement future permits or revised SSLAPs will be <br />addressed under a separate task or contract amendment' <br />Task 5.0 - On-Call Services <br />Objective <br />Provide as-needed engineering, environmental, and permitting supportfor regulatory, operational, and <br />technicaI needs at the Ryegrass Facility that fall outside the defined annual scope of Tasks 1.0 through 3.0. This <br />task covers occasional or contingent work that is only performed upon County request and authorization, and is <br />intended to address evolving facility priorities, regulatory changes, or unforeseen conditions. Below are three <br />known subtasks that will be executed during this contract, but the timing, budget, and full scope of each will be <br />determined as the work is authorized. Additional subtasks may also be added during the contract term. <br />Subtask 5.1 - LPL Closure <br />Activities <br />Activities may include, but are not limited to: <br />e Preparation of 90% design and permit documents for closure. <br />. Coordination with Ecology for closure approvals. <br />r Development of a closure phasing plan for cover system installation (schedule to be determined) <br />. Construction management and certification of closure. <br />Subtask 5.2 - New Leachate Evaporation Pond <br />Activities <br />Activities may include, but are not limited to: <br />r Siting and design of a new leachate evaporation pond downstream of the landfill. <br />Kittitas County Agreement for Service s lrev. 5/14/25) <br />Page 10 of 28
The URL can be used to link to this page
Your browser does not support the video tag.