My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT A_Kittitas Public Health_Feasibility Study_MWA Scope and Fee_2025 11 04 (002)
>
Meetings
>
2025
>
11. November
>
2025-11-04 10:00 AM - Commissioners' Agenda
>
EXHIBIT A_Kittitas Public Health_Feasibility Study_MWA Scope and Fee_2025 11 04 (002)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 12:03:01 PM
Creation date
10/30/2025 12:02:24 PM
Metadata
Fields
Template:
Meeting
Date
11/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve the Kittitas County Public Health & Safety Building Feasibility Study
Order
3
Placement
Consent Agenda
Row ID
137354
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWA ARCHITECTS | 20 <br /> <br /> DAN DEYMONAZ <br />Owner / Senior Cost Estimator <br /> <br /> <br />With over 35 years of industry experience, I have partnered with all project <br />members to provide reliable, meaningful, and accurate cost estimating <br />services. I have collaborated with owners, stakeholders, and designers to <br />assist project teams with understanding and managing construction costs. My <br />focus as the owner of Sound Northwest Precon Services, is to provide <br />collaborative and selfless leadership to the clients and stakeholders I serve. <br /> <br /> <br />EDUCATION <br />Eastern Washington University - General Physics, Mathematics Cheney, WA <br /> SELECT EXPERIENCE <br /> <br />NorthStar CG, Fall City, Washington <br />Employment – 12yrs. Roles included Sr. Project Manager, Sr. Estimator, and Chief Estimator. <br />NorthStar CG is the #1 Demolition and Remediation Contractor in the USA (ENR-2020). Over $5 billion of <br />projects successfully completed since 1986. NorthStar CG is a full-service emergency and disaster <br />response team. <br />• Dayton, TN Silo Fire <br />• Griffin Wheel Plant – Winnipeg, CA <br />o Catastrophic Fire Restoration & Reconstruction <br />• www.northstar.com <br /> <br /> Spokane International Airport, <br /> Pre-Design through CD Cost Est. $36MM <br />40,288 sf Airport Administration Building with an 8,351 sf Pre-Manufactured Parking Structure and 123,560 <br />sf of site work. This project is currently under construction with an 18-month duration. Sound Northwest <br />Precon Services was hired by the Design Team to provide side by side estimates with the awarded GC of <br />the project. SNW Precon Services provided cost estimates from Conceptual Pre-Design through GMP. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.