Laserfiche WebLink
MWA ARCHITECTS | 20 <br /> <br /> DAN DEYMONAZ <br />Owner / Senior Cost Estimator <br /> <br /> <br />With over 35 years of industry experience, I have partnered with all project <br />members to provide reliable, meaningful, and accurate cost estimating <br />services. I have collaborated with owners, stakeholders, and designers to <br />assist project teams with understanding and managing construction costs. My <br />focus as the owner of Sound Northwest Precon Services, is to provide <br />collaborative and selfless leadership to the clients and stakeholders I serve. <br /> <br /> <br />EDUCATION <br />Eastern Washington University - General Physics, Mathematics Cheney, WA <br /> SELECT EXPERIENCE <br /> <br />NorthStar CG, Fall City, Washington <br />Employment – 12yrs. Roles included Sr. Project Manager, Sr. Estimator, and Chief Estimator. <br />NorthStar CG is the #1 Demolition and Remediation Contractor in the USA (ENR-2020). Over $5 billion of <br />projects successfully completed since 1986. NorthStar CG is a full-service emergency and disaster <br />response team. <br />• Dayton, TN Silo Fire <br />• Griffin Wheel Plant – Winnipeg, CA <br />o Catastrophic Fire Restoration & Reconstruction <br />• www.northstar.com <br /> <br /> Spokane International Airport, <br /> Pre-Design through CD Cost Est. $36MM <br />40,288 sf Airport Administration Building with an 8,351 sf Pre-Manufactured Parking Structure and 123,560 <br />sf of site work. This project is currently under construction with an 18-month duration. Sound Northwest <br />Precon Services was hired by the Design Team to provide side by side estimates with the awarded GC of <br />the project. SNW Precon Services provided cost estimates from Conceptual Pre-Design through GMP. <br /> <br />