My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September BOH Packet
>
Meetings
>
2025
>
09. September
>
2025-09-18 10:00 AM - Joint BOCC and Board of Health Public Hearing to be followed by Regular Board of Health
>
September BOH Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 3:23:29 PM
Creation date
9/12/2025 2:12:21 PM
Metadata
Fields
Template:
Meeting
Date
9/18/2025
Meeting title
Joint BOCC and Board of Health Public Hearing to be followed by Regular Board of Health
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Health <br />` Department <br />To Protect and Promote the Health and the Environment of the People of Kittitas County <br />■Projections of potential impacts to service demand and delivery, including economic uncertainties and <br />state and local code changes <br />New to 2026 EH fee calculations, staff have included a review of five-year actuals and averages of time data. As <br />with the review of permit/inspection volume over five years, incorporating this data aids in identifying outliers due <br />to staffing changes and one-time situations that may skew actuals within one year. Staff anticipate that this <br />additional perspective will help to keep fees more stable and reflect expected incremental increases, rather than <br />Large jumps. However, as this is the first time that this data has been applied, most fees have an updated amount <br />in 2026, both increase and decrease, outside of specific changes or circumstances outlined below. Because of <br />this process change, staff recommend updating allfees no matter how smallthe percentage change. <br />As proposed, 37 fees decrease, 33 fees increase, and all other fees (27) remain unchanged from 2025. The overall <br />average change per fee is a $120 reduction or 13%. For detailed fee breakdown and comparison to current 2025 <br />fees, please see Appendix B. Fees for vital records services are determined by Washington State and are <br />unchanged from 2025. KCPHD estimates approximately $65,000 in revenue from processing fees for birth and <br />death records. <br />The proposed 2026 fees are 68% of the Environmental Public Health budget, and when combined with vital <br />records and passport fee revenue, are 10% of the overall department budget. <br />Several changes are proposed for 2025: <br />Zero Volume Estimate Update <br />Many of the Solid Waste fees are infrequently or yet to be used, but are in place for future potential solid waste <br />remediation, sites and facilities. Due to low or no hours associated with the activities, KCPHD bases the fees on <br />estimates of time needed. Periodically those estimates are updated based on other similar fees. For the 2026 fees, <br />staff averaged similar fee activities and updated fees for landfills, solid waste digesters, biosolids utilization, <br />demolition, wood waste, closed landfills, surface impoundment, tire storage, and petroleum contaminated soil <br />based on that average. These fees are now listed at the average cost of $1,2220 until KCPHD has actuals for time <br />and volume to calculate the more exact cost of service. <br />Eliminating On -Site Septic (OSS) Renewal Fee <br />OSS renewal fee will be removed due to the extension of on -site septic permits to five years to align with state <br />code. At the end of that five-year period, state law already requires a new site evaluation, so a renewal is no longer <br />necessary. This change benefits both contractors who have additional time to work under a valid permit, and <br />property owners who avoid paying for a renewal that would be redundant. There is no cost difference between a <br />renewal and a new permit after five years. <br />Comprehensive School Inspections <br />Previously schools were subject to multiple fees for different inspections, which were completed at different times <br />throughout the year. The new Comprehensive School Inspection fee now includes the full school inspection, <br />playground inspection, and food inspections. It is structured this way to increase efficiency of inspection time; <br />inspectors are already on -site conducting the school and playground inspections and can now complete the food <br />inspection at the same time. In some cases, it may be necessary to return later for a second food inspection, but <br />the fee has been calculated with the appropriate hours to ensure that time is accounted for <br />Kittitas County Public Health Department— 2026 Preliminary Budget Narrative Page 14 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.