My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-08-12-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
09. September
>
2025-09-02 10:00 AM - Commissioners' Agenda
>
2025-08-12-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 12:17:58 PM
Creation date
8/28/2025 12:14:14 PM
Metadata
Fields
Template:
Meeting
Date
9/2/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
135022
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAAS <br />8t <br />,SMITH-,. <br />Patti Stacey <br />Kittitas County Solid Waste <br />1001 Industrial Way <br />Ellensburg, WA 98926 <br />Project: Lower County Transfer Station Scale Improvements <br />BELSAAS & SMITH CONSTRUCTION, INC. <br />P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />February 24111, 2025 <br />RE: Change Order Proposal 22— Retaining Wall Drain and Roof Drains at Transfer Station Building <br />We are offering the described work and pricing below as a Change Order Proposal to account for additional costs <br />due to design changes proposed by the Owner. <br />Plan Sheet C5A was provided with revisions detailing a drainage envelope being installed on the west side of both <br />retaining walls running north and south beyond the tunnel wall. The drainage envelope is simply a perforated 4" <br />pipe surrounded in an 18" x 18" square of drain rock and wrapped in fabric. The drain runs the length of the wall <br />and stair area to the south. The pipes daylight out at the lower end of the walls. <br />Plan Sheet C6 was provided with revisions detailing a new collector pipe running along the west edge of the <br />transfer building, stubbing up at each proposed roof drain, and then daylighting to the south at the bottom of the <br />building mound with a splash pad and swale to drain. <br />The total cost of the change order is listed below and broken down on the attached spreadsheet. <br />Change Order Total: $ 17,758.00 <br />No additional contract time will be requested with this proposal. <br />Feel free to contact me with questions or concerns. <br />Sincerely, <br />'6-ya'y Ale'60ir <br />Bryan Nelson <br />Belsaas & Smith Construction, Inc. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.