Laserfiche WebLink
Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />August12,2025 <br />Belsaas and Smith Construction <br />103 East 411 Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 9 <br />Mr. Nelson, <br />I am writing to formally acknowledge and award change order number 9 forthe following Change <br />Order Proposals (COP): <br />COP #37R: Tire Center <br />Change Order No. 9 Total <br />$127,737.00 <br />$127,737.00 <br />This change adds 15 Calendar days to our contract dated September 3, 2024. <br />Base Bid and AdditiveA2 <br />$18,441,939.80 <br />Additive Al <br />$642,000.00 <br />Change Order No. 2 <br /><$11,754.08> <br />Change Order No. 3 <br /><$28,041.41> <br />Change Order No. 4 <br />$145,224.93 <br />Change Order No. 5 <br />$233,662.44 <br />Change Order No. 6 <br /><$24,051.84> <br />Change Order No. 7 <br />$96,439.74 <br />Change Order No. 8 <br />$104,401.24 <br />Change Order No. 9 <br />$127,737.00 <br />Subtotal <br />$19,727,557.82 <br />WSST <br />$1,696,569.97 <br />Total $21,424,127.79 <br />