My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-143
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
R2025-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 8:55:28 AM
Creation date
8/21/2025 8:51:07 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025 Kittitas County Hazard Mitigation Plan as Approved by the Federal Emergency Management Agency
Order
11
Placement
Consent Agenda
Row ID
133785
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Hazard Mitigation Plan <br />Kittitas County, Washington <br />Flood Control Zone District <br />Capital lmprovement <br />Planning <br />Each year the Flood Control Zone District updates its 6-year Capital <br />lmprovement Plan (ClP). This Plan is then incorporated into the County (ClP). <br />Mitigation measures in the Hazard Mitigation Plan for flood and levee related <br />hazards inform this ClP. <br />Comprehensive Flood Hazard <br />Management Planning <br />Kittitas County fully integrates Comprehensive Flood Hazard Management <br />Planning into the County's Hazard Mitigation Plan. Washington State Flood <br />Control Account Assistance Program (FCAAP) funding was available for <br />technical studies and planning efforts to update Flood Hazard Plans. Kittitas <br />County conducted a technical assessment of the Yakima River Easton Reach, <br />addressing flood risks for severalfloodplain communities and advancing several <br />mitigation measures identified in the 2019 Hazard Mitigation Plan. Additionally, <br />the City of Ellensburg is currently implementing an FCAAP funded project to <br />conduct an in-depth analysis of urban flooding caused by Whiskey and Mercer <br />creeks within the Ellensburg Urban Growth Area and city limits. <br />Community Rating System <br />Kittitas County participation in the Community Rating System (CRS) helps <br />determine the Flood Control Zone District Work Program. The District's Work <br />Program includes annual progress reporting on Hazard Mitigation Plan <br />implementation and outreach projects regarding flood hazards. CRS is a <br />voluntary incentive program that recognizes and encourages community <br />floodplain management practices that exceed the minimum requirements of the <br />NFIP. <br />Community Wildlife <br />Protection Plan <br />This Plan was considered during discussion of the Wildfire portion of the Risk <br />Assessment section of this Hazard Mitigation Plan and helped inform identified <br />mitiqation strateqies to address wildfire risk. <br />Washington State Wildland <br />Fire Protection 10 - Year <br />Strategic Plan <br />The State's Wildland Fire Protection Strategic Plan is a blueprint for effective <br />wildland fire protection in Washington and inform associated policy and resource <br />decisions. The Plan is also anchored in the National Cohesive Wildland Fire <br />Management Strategy and shares its focus on resilient landscapes, fire-adapted <br />communities, and safe, effective wildfire response. The Wildland Fire Protection <br />Strategic Plan focuses on wildfire prevention, reducing human-caused ignitions, <br />and post-fire recovery and informed the CWPP. <br />Washington State Eastern <br />Washington 20 -Year Forest <br />Health Strategic Plan: <br />The 20-Year Forest Health Strategic Plan was developed by the DNR to treat <br />areas of state forest land that have been identified as being in poor health. The <br />plan sets a vision, guiding principles, and process for moving forward, and takes <br />an all-lands approach that is science-based for treating 1.25 million forested <br />acres in Eastern Washinqton. This Strateqic Plan helped inform the CWPP. <br />Planning lnitiative Description <br />3.10.2. Potential Future lntegration <br />As the Hazard Mitigation Plan is implemented, Kittitas County will use information from the Plan as the <br />best available science and data on hazards. The capability assessment presented in Section 3.9 of this <br />Plan identifies codes, plans, and programs that provide opportunities for integration. The countywide and <br />local action plans developed for this Plan are related to plan integration. The capability assessment <br />identified plans and programs, listed in Table 3-23, that do not currently integrate goals and <br />recommendations of this Plan but provide opportunities to do so in the future. <br />Chapter 3: Community Profile 48
The URL can be used to link to this page
Your browser does not support the video tag.