My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-143
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
R2025-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 8:55:28 AM
Creation date
8/21/2025 8:51:07 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025 Kittitas County Hazard Mitigation Plan as Approved by the Federal Emergency Management Agency
Order
11
Placement
Consent Agenda
Row ID
133785
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Hazard Mitigation Plan <br />Kittitas County, Washington ffitffil <br />CHAPTER 1 . INTRODUCTION <br />The Kittitas County Hazard Mitigation Plan (Plan) was developed to guide the County in a risk-based <br />approach to become more resilient to the impacts of natural hazards through mitigation planning. The <br />Plan documents historical disasters, assesses probabilistic disasters through Hazus-MH and Geographic <br />lnformation System (GlS) analysis, and addresses specific strategies to mitigate the potential impacts of <br />these disasters. <br />This five (5) year update was a collaborative effort among the Kittitas County Core Planning Team and <br />Steering Committee. The Plan accomplishes the following: <br />ldentifies areas of risk and assesses the probability, extent, vulnerability, and impacts for each <br />natural hazard. <br />. Establishes strategies and priorities to mitigate risk from natural hazards. <br />. ldentifies specific mitigation projects to pursue for each identified natural hazard. <br />. Guides the communities in their risk management activities and minimizes conflicts among <br />agencies. <br />o Establishes eligibility for future mitigation program funds. <br />1.1. PURPOSE OF THE PLAN <br />The Plan identifies activities that can be undertaken by both the public and private sectors to reduce risk <br />to natural hazards, property damage, and economic disruption caused by these hazards. This Plan <br />reviews mitigation activities and selects those that will be most beneficial for Kittitas County. <br />The Federal Disaster Mitigation Act of 2000 requires jurisdictions to develop and maintain a Hazard <br />Mitigation Plan to remain eligible for certain Federal disaster assistance and hazard mitigation funding <br />programs (e.9., Hazard Mitigation Grant Program, Building Resilient lnfrastructure and Communities). <br />Renewal of the Plan every five (5) years is required to encourage continual awareness of mitigation <br />strategies. Additionally, communities that participate in the Federal Emergency Management Agency <br />(FEMA) Community Rating System (CRS), a voluntary program that reduces National Flood lnsurance <br />Program (NFIP) premiums and are designated as a Category C repetitive loss community, must prepare <br />a Floodplain Management Plan (FMP) or a Repetitive Loss Area Analysis (RLAA). However, the CRS <br />Program allows multi-hazard, and multi-jurisdictional mitigation plans to fulfill this requirement. <br />This Plan fulfills the federal requirements for mitigation funding outlined in 44 Code of Federal Regulations <br />(CFR), section 201.6 (44 CFR S 201.6) and United States Code (USC) 42, section 5165 (42 USC S 5165), <br />the CRS Program and provides the jurisdiction with a blueprint for reducing the impacts of natural <br />hazards. <br />1.2. HAZARD MITIGATION PROGRAM <br />Hazard mitigation is defined as any sustainable action taken to reduce or eliminate long-term risk to <br />people, property, and the environment from future disasters. Mitigation planning breaks the cycle of <br />disaster damage, reconstruction, and repeated damage. Hazard mitigation includes long-term solutions <br />that reduce the impact of disasters in the future. <br />a <br />5Chapter 1 : lntroduction
The URL can be used to link to this page
Your browser does not support the video tag.