My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-143
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
R2025-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 8:55:28 AM
Creation date
8/21/2025 8:51:07 AM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025 Kittitas County Hazard Mitigation Plan as Approved by the Federal Emergency Management Agency
Order
11
Placement
Consent Agenda
Row ID
133785
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Hazard Mitigation Plan <br />Kittitas County, Washington <br />Table 4-58. Hazus Earthquake Expected Damage to Transportation Systems <br />Table 4-59 provides a detailed breakdown in transportation system economic losses in Millions of dollars. <br />Table 4-59. Hazus Earthquake Transportation System Economic Losses <br />(Millions of Dollars) <br />58 0 0 58 58Segments <br />0 316 316Bridges3160 <br />2 2 <br />Highway <br />Tunnels 2 0 0 <br />7Segments007 <br />45 0 0 45 45Bridges <br />0 0 0 0Tunnels0 <br />0 0 <br />Railways <br />Facilities 0 0 0 <br />0Segments0000 <br />0 0 0 0 0Bridges <br />0 0 0Tunnels00 <br />0 0 <br />Light Rail <br />Facilities 0 0 0 <br />1 1BusFacilitiesI00 <br />0 0 0 0 0FerryFacilities <br />0 0 0 0PortFacilities0 <br />3 JFacilities300 <br />5Runways5005 <br />Airport <br />System Gomponent Locations / <br />Segmenfs <br />With at <br />Leasf <br />Moderate <br />with <br />Complete <br />Damage <br />With Functionality <br />Greater than 50% <br />After Day 1 After Day 7 <br />Number of Locations <br />Segments 1,992.2 0.0 0.0 <br />657.8 0.1 0.0Bridges <br />0.0 0.0Tunnels4.6 <br />TOTAL 2,654.5 0.1 <br />Highway <br />175.1 0.0 0.0Segments <br />225.2 0.0 0.0Bridges <br />0.0 0.0Tunnels0.0 <br />0.0Facilities0.0 0.0 <br />TOTAL 400.4 0.0 <br />Railways <br />System Component lnventory Value Economic Loss Loss Ratio (%) <br />Chapter 4: Hazard ldentification and Risk Assessment 120
The URL can be used to link to this page
Your browser does not support the video tag.