My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-134
>
Meetings
>
2025
>
07. July
>
2025-07-15 10:00 AM - Commissioners' Agenda
>
R2025-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:37:15 AM
Creation date
8/20/2025 10:36:25 AM
Metadata
Fields
Template:
Meeting
Date
7/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Granting Approval to Roslyn Ridge West Planned Unit Development (PD-24-00001), Short Plat (SP-24-00004) Final Development Plan
Order
12
Placement
Consent Agenda
Row ID
133196
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Proposed location of fire protection facilities; <br />and in the General Notes under Note 6 printed on the face of the drawing. Fire <br />hydrants will be placed as required by the IFC or the Kittitas County Code. <br />h. ProPosed storm drainage Plan; <br />in the General Notes under Note 7 printed on the face of the drawing. We will be <br />using the roadside ditches to gather the storm water and grass lined ditches to <br />control the storm water. <br />S. Certification from state and local health authorities that water and sewer <br />systems are available to accommodate the development; <br />>>>>Attached as Exhibit F is the required information regarding the Evergreen <br />Water System. Attached as Exhibit G is the required information regarding the <br />sewage'disposal system being a Large Onsite Septic System (LOSS). <br />4. Provisions to assure permanence and maintenance of common open <br />spaces; <br />Phase 2, or Phase 3. <br />S. Stratement of intent including estimated cost for landscaping and restoration <br />of natural areas despoiled by construction including tree planting; <br />natural occurring plants, trees, and grasses after all construction has been <br />completed. lt is estimated the cost will be $2,500 per acre according to 2025 cost <br />calculations. <br />6. Certification by the county of transfer of the required density credits in <br />compliance witn KGC Ch-apter.1tL3, Transfer of Development-Rights. (8r+ <br />eot o-oog, 201 0; ord. 2007 -22, 2OO7 ; Ord. 96-1 9 (part), 1 996; Ord. 90-6 <br />(part), 1990: Res.83-10, 1983) <br />16 - EXHIBIT I - DENSITY - UPDATED 61 LOTS - Updated 6-3-24 (1)'pdf' as <br />found within the Kittitas Coun$ Community Development Services website under <br />the active land use applications "Rezones" section for the Roslyn Ridge West <br />project outlines the density calculations for the proposed Roslyn Ridge West <br />Roslyn Ridge West Final Development Plan <br />Page 8 of 10 <br />+17-20251514
The URL can be used to link to this page
Your browser does not support the video tag.