Laserfiche WebLink
uuuustgil EilvEluPv lu. +vJoavo l-J/ JF-louz-Yoo l_l lE lro+Dr+ I J <br />State of Washington, Department of Ecology <br />IAA No. C2500178 <br />Entity Name: Kittitas Counfy Public Health <br />End of Visit / After Visit: <br />Provide written follow-up to the business to docurnent the results of the visit. This can be dorre by <br />leaving a copy of the checklist or other documentation with the business at the end of the visit, by <br />using a commitrnent postcard (format available in Education & Outreach Documents on PPA <br />Partnership SharePoint), or by sending follow-up letters/emails, or alternatively by sending a <br />"thank you" postcard if no issues were identified. <br />If necessary, coordinate with other agencies (e.g., the fire marshal, code enforcemetlt, stonnwater, <br />wastewater treatrnent, and/or moderate risk waste staff) to ensure that the infonnation you are <br />providing is consistent with the other agency's regulations and/or best managemerrt practices. <br />PPA Specialists will make referrals to ECOLOGY and other regulatory agencies as needed and <br />document the referral in the Local Source Control (LSC) database (Link in Appendix A, <br />Statement of Work, Section 12: Resources). <br />Section 3. Unique Program Elements <br />The CONTRACTOR will conduct the unique program elements for their PPA prograrn as outlined in <br />Table 3. 1, below. <br />Table 3.1: Un P Elements <br />a <br />a <br />a <br />Unique Program <br />Element Description Deliverable(s) <br />All-Staff Planning <br />Committee <br />Four separate committees <br />(one for each training <br />event) made up of PPA <br />Specialists and Ecology. <br />The committee will work <br />to schedule and facilitate <br />the meetings. The format <br />for these meetings will <br />likely be one in-person <br />per year and one virtual <br />meeting per year. <br />a Work with olte or two other.iurisdictions to <br />plan I All-Staff Trairring Event (virtualor <br />in-person) for the Spring 2027 PPA All- <br />Staff. <br />With other comrnittee members, determine a <br />committee chair to schedule planrring <br />meetings, track tasks, and finalize the <br />agenda. <br />Arrange for meeting logistics (venue, food, <br />and beverage, if in person) and speakers. <br />Participate in all workgroup meetings. If <br />you are unable to attend the meeting, give <br />the committee chair as much notice as <br />possible, and follow up with any <br />assignments or document review as sooll as <br />possible. <br />a <br />a <br />a <br />Resource <br />Consistency <br />Committee (RCC) <br />Participate on a team to <br />enhance partnership <br />brandirrg and consistency <br />across partners. <br />. Review and advise partners on logo and <br />template use, material and website design, <br />and other projects as needed. <br />o Particip ate in 90Vo of scheduled meetings. <br />. Review all assigned materials. <br />r Provide an update on the program in each <br />quarterly report. <br />o Provide an update on the program in each <br />annual report. <br />Version 4/14l2,s (Access Equity) <br />l5