Laserfiche WebLink
<br />2026-2031 Summary Page 2 <br /> <br /> <br />2026-2031 Summary <br />The following table summarizes the 2026-2031 Six-Year Plan. <br />(Budgets have been estimated in 2026 dollars using a 3% inflation factor. A 3% inflation factor <br />should be applied to estimates per year until an engineer’s estimate is produced with design.) <br /> <br />Six-Year Plan Summary <br />2026-2031 Summary Kittitas County Public Facility Projects <br />1. Airport Facilities <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Hangar Taxilane <br />Complex (West) <br />Bowers Field Airport. New <br />hangar, taxilane including <br />asphalt paving and markings. <br />Federal <br />Aviation <br />Administration <br />(FAA) General <br />Aviation (GA) <br />Entitlement and <br />Local Match <br />2026 1,227,005 <br />Runway 11/29 <br />Parallel Taxiway and <br />Taxiway Lighting <br />Project <br />Bowers Field Airport. Construct <br />new parallel taxiway including <br />pavement, lighting, and <br />marking installation <br />FAA GA <br />Entitlement and <br />other funding, <br />Local Match <br />2026 7,344,840 <br />ALP Update with <br />Forecast Verification <br />Bowers Field Airport. Minor <br />update to the Airport Layout <br />Plan to include Forecast <br />Verification <br />FAA GA <br />Entitlement and <br />other funding <br />2027 $60,000 <br />Rehabilitate Runway <br />11/29 <br />Bowers Field Airport. <br />Rehabilitate Runway 11/29 <br />including AGIS survey, <br />reducing the runway width, <br />drainage improvements, and <br />replacing the runway lighting <br />system. <br /> FAA GA <br />Entitlement, <br />Local Match <br />2028-2030 $3,666,667 <br />Industrial Park <br />Building <br />Development <br />Bowers Field, Design and <br />construct two new industrial <br />buildings in the Bowers Field <br />Industrial Park. <br />TBD 2027-2030 TBD <br />Hangar Taxilane <br />Complex (East) <br />Bowers Field Airport. New <br />hangar taxilane including <br />asphalt paving and markings. <br />FAA GA <br />Entitlement and <br />Local Match <br />2029-2031 $1,166,667 <br />Wildlife Hazard <br />Mitigation <br />Develop and construct wildlife <br />hazard mitigations in the <br />vicinity of runway 11/29 <br />FAA GA <br />Entitlement and <br />other funding <br />2030 $2,450,000 <br />Runway 11 <br />Extension <br />Bowers Field Airport. Extend <br />Runway 11/29 Design <br />FAA GA <br />Entitlement and <br />other funding <br />2030 $500,000 <br />2. Kittitas County Administrative Offices <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Relocate Permit <br />Center and Health <br />Department <br />411 N Ruby, Ellensburg. <br />Relocate facilities for <br />Community Development <br />Services (CDS), Public Works <br />General <br />Obligation <br />Bonds <br />2022-2031 $15,950,000