My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ellensburg Fieldhouse Project (003)
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
Ellensburg Fieldhouse Project (003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:12:47 PM
Creation date
7/31/2025 12:04:10 PM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Adopting the Kittitas County Tourism Infrastructure Project Applications
Order
1
Placement
Board Discussion and Decision
Row ID
133789
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B *KING <br />b�y & ASSOCIATES LTD <br />l� Recreation Planning and Operations Consultants <br />Operational Plan <br />As part of the design process, the project team developed an independent third -party <br />operations plan for concepts of the proposed facility. It is important to note that when <br />developing these operational plans, they are based on the market, the cost recovery <br />goals of the client, team members familiarity with operating similar facilities, and <br />industry best practices. It is also important to note the team takes a conservative <br />approach to the development of each plan. If significant changes were made to the <br />facility program and/or design, the City of Ellensburg should strongly consider updating <br />the operational figures. <br />The following assumptions have been made in the development of these plans. <br />• The City of Ellensburg will be the operator of the facility. <br />• The operational plan does not reflect 100% capacity regarding programming, <br />admissions, or rentals. Which is to say that revenue generation could increase. <br />From an expense perspective, increases in that line item would be directly offset <br />by program revenue. <br />• It is assumed that maintenance and custodial of the facilities would be in-house, <br />as part of the department. The success of these facilities is tied to them being <br />able to operate in a business -like fashion. The autonomy of in-house <br />maintenance and custodial staff is part of that business -like fashion. The <br />exception, in this instance, is Concept C where a custodial contract may be <br />preferred. <br />• Each option does have some contract services built into the plan for specialty <br />items such as Heating Ventilation Air Conditioning (HVAC) maintenance, <br />hardwood floor resurfacing, etc. <br />• A capital improvement allocation has been recommended. B*K is strongly <br />recommending that during the first full calendar year of operation, dollars are <br />allocated to this sinking fund. If the department were to do that, they would have <br />access to substantial balances in years 3-5 to replace equipment and make small <br />improvements to the facility. <br />• The expense and revenue statements assume the first full year of operation. <br />They do not account for a ramp up or partial year operation which could be a <br />reality. <br />• Full -Time Employees (FTE) represent all new staffing and have been confirmed <br />by City of Ellensburg staff. For each full-time position a benefit multiplier of 45% <br />was used based on previous budgets. <br />541 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.