My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_2025 Kittitas County Hazard Mitigation Plan
>
Meetings
>
2025
>
08. August
>
2025-08-05 10:00 AM - Commissioners' Agenda
>
Resolution_2025 Kittitas County Hazard Mitigation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 12:07:24 PM
Creation date
7/31/2025 12:04:00 PM
Metadata
Fields
Template:
Meeting
Date
8/5/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025 Kittitas County Hazard Mitigation Plan as Approved by the Federal Emergency Management Agency
Order
11
Placement
Consent Agenda
Row ID
133785
Type
Resolution
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Hazard Mitigation Plan <br />Kittitas County, Washington <br /> <br /> <br />Chapter 4: Hazard Identification and Risk Assessment 119 <br />Table 4-56. Hazus Earthquake Expected Damage to Essential Facilities <br />Facility Total <br />At Least <br />Moderate <br />(Greater than <br />50% damage) <br />Complete <br />(Greater than <br />50% damage) <br />With <br />Functionality <br />(Greater than <br />50% on day 1) <br />Hospitals 1 0 0 1 <br />Schools 22 0 0 22 <br />Emergency Operations Center 2 0 0 2 <br />Police Stations 6 0 0 6 <br />Fire Stations 20 0 0 20 <br /> <br />The total building related losses were $65.7 Million. 27.0% of the estimated losses were related to the <br />business interruption in Kittitas County. The largest loss was sustained by the residential occupancies, <br />which made up over 22.0% of the total loss. Table 4-57 provides a summary of the losses associated <br />with the building damage in Millions of dollars. <br />Table 4-57. Hazus Earthquake Building Related Economic Loss Estimates <br />(Millions of Dollars) <br /> Area Single <br />Family <br />Other <br />Residential Commercial Industrial Others Total <br />Income <br />Losses <br />Wage 0.00 0.15 2.85 0.07 1.67 4.74 <br />Capital- <br />Related 0.00 0.06 3.00 0.04 0.22 3.33 <br />Rental 0.16 0.40 1.16 0.06 0.98 2.75 <br />Relocation 0.50 0.44 1.58 0.20 3.89 6.61 <br />TOTAL 0.66 1.06 8.59 0.36 6.76 17.43 <br />Capital <br />Stock <br />Losses <br />Structural 1.36 1.06 2.56 0.54 3.02 8.54 <br />Non- <br />Structural 4.93 3.89 5.53 1.35 12.43 28.11 <br />Content 1.10 0.70 2.35 0.84 5.97 10.96 <br />Inventory 0.00 0.0 0.46 0.15 0.02 0.63 <br />TOTAL 7.38 5.64 10.90 2.89 21.44 48.25 <br />SUBTOTAL 8.04 6.70 19.49 3.25 28.20 65.67 <br /> <br />Hazus estimates the number of households that are expected to be displaced from their homes due to <br />the earthquake incident. Hazus also estimates the number of displaced individuals that will require <br />accommodations in temporary public shelters. The model estimates eight (8) households will be <br />displaced due to the earthquake. Of these, four (4) people (out of a total population of 44,337) will seek <br />temporary shelter in public shelters. <br /> <br />For the transportation systems, Hazus computes the direct repair cost for each component only. Table <br />4-58 provides damage estimate for the transportation systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.