Laserfiche WebLink
LJUL'uwy II GI IvulupC ILJ. YUJu-tvu I-J! Jr-Y000-U00 I- I I C I ru'40.7'f I J <br />State of Washington, Department of Ecology <br />IAA No. C2500178 <br />Entity Name: Kittitas County Public Health <br />APPENDIX A <br />STATEMENT OF WORK <br />Section 1. Introduction <br />This statement of work is for the 2025 — 2027 biennial Interagency Agreement (IAA) for the Pollution <br />Prevention Assistance (PPA) Partnership, which is overseen by the Washington State Department of <br />Ecology (ECOLOGY), Hazardous Waste & Toxic Reduction Program (HWTR). <br />The mission of the PPA Partnership is: <br />"We protect Washington's residents and environment by helping small businesses reduce toxic <br />chemical use, safely manage dangerous waste, and keep stormwater free of pollutants. " <br />The CONTRACTOR, through their Pollution Prevention Assistance (PPA) program, will conduct <br />multimedia source control site visits and pollution prevention activities to businesses that are small <br />quantity generators (SQGs) of dangerous waste. In this context an SQG is any business, non-profit, <br />facility, school, or other organization that generates less than 220 pounds of dangerous waste per calendar <br />month and less than 2.2 pounds of extremely hazardous waste per calendar month. The site visits, along <br />with other pollution prevention activities conducted by the CONTRACTOR, will be designed to reduce or <br />eliminate dangerous waste and other pollutants at the source through best management practices that <br />prevent spills and discharges to ground, air, and water (especially to industrial wastewater and <br />stormwater). <br />To further facilitate the reduction or elimination of toxic chemical use at the source, the CONTRACTOR <br />will seek and discuss opportunities to assist businesses with switching processes, products, or equipment <br />to use effective safer alternatives. This program will be known as the "Product Replacement Program" or <br />PRP. <br />PPA work for the 2025 — 2027 contract cycle is expected to fall within the below general <br />proportions: <br />Table 1.1: PPA Work Tasks <br />PPA Work Tasks <br />% of Time Spent <br />_ <br />Technical Assistance (TA) Visitst <br />60% <br />(See Appendix A, Statement of Work, Section 2 for more details) <br />Unique Program Elements <br />15% <br />(See Appendix A, Statement of Work, Section 3 for more details) <br />Training <br />20% <br />(See Appendix A, Statement of Work, Section 8 for more details) <br />Other <br />5% <br />(Admin, staff meetings, etc) <br />Approximately 10 — 15% of TA visits may involve Product Replacement Program visits. <br />10 <br />Version 4/14/25 (Access Equity) <br />