Laserfiche WebLink
r� <br />BELSAAS <br />�c <br />SMITH <br />BELSASC0330H <br />March 25, 2025 <br />Re: ADA Ramp and Staircase COP #25 <br />P.O. BOX 926 / 103 EAST 4- AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #25 (COP#25). <br />All the cost associated with suppling and installing an ADA access ramp and staircase to access <br />each door of the compost office trailer. <br />• ADA Ramp: 30' Ramp, QTY of two 5' x 5' landing - Aluminum <br />• Staircase with 5' x 5' landing - Aluminum <br />Total Cost Added to Contract: <br />Time extension required: 0 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$21,493.41 + WSST <br />