My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-05-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
06. June
>
2025-06-17 10:00 AM - Commissioners' Agenda
>
2025-05-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 12:54:14 PM
Creation date
6/12/2025 12:49:56 PM
Metadata
Fields
Template:
Meeting
Date
6/17/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
132242
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M I I <br />ELECTRICAL <br />Titan Electrical LLC <br />PO Box 698 <br />Selah, Washington 98942 <br />Phone: (509) 941-8306 <br />PCO #005 <br />Project: C24-197 - Lower Valley Transfer Station - Kittitas <br />925 Industrial Way <br />Ellensburg, Washington 98926 <br />Prime Contract Potential Change Order #005: Added Lift Station <br />TO: Belsaas & Smith Construction Inc. FROM: Titan Electrical LLC <br />103 E 4th Ave # 209 215 Keys Rd <br />Ellensburg, Washington 98926 Yakima, Washington 98901 <br />PCO NUMBER/REVISION: 005 / 0 CONTRACT: 1 - Lower Valley Transfer Station <br />REQUEST RECEIVED FROM: CREATED BY: Mike Yusi (Titan Electrical LLC) <br />STATUS: Pending - In Review CREATED DATE: 2/17/2025 <br />REFERENCE: PRIME CONTRACT None <br />CHANGE ORDER: <br />FIELD CHANGE: No <br />LOCATION: ACCOUNTING METHOD: Amount Based <br />SCHEDULE IMPACT: PAID IN FULL: No <br />EXECUTED: No SIGNED CHANGE ORDER <br />RECEIVED DATE: <br />TOTAL AMOUNT: $7,795.18 <br />POTENTIAL CHANGE ORDER TITLE: Added Lift Station <br />CHANGE REASON: Allowance <br />POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) <br />Added Lift Station <br />Cost is to supply 30a 2p circuit from PP-T to added lift station per RFI 32 and Addendum 6 drawings: <br />—300' of conduit and #8's to lift station disconnect <br />2P 30a fusible 3R disconnect <br />(2) runs from controller (provided by others) to lift station riser for pump and Float wiring <br />(2) explosion -proof boxes in riser for makeup <br />Controller provided by others <br />Pump and Floats provided and installed by others - we are wiring only <br />TOTAL COST - $7,795.18 <br />ATTACHMENTS: <br />Matedol.pdf , _Summap. df , _E601-E603.pdf , _E100.Rdf <br /># <br />Budget Code <br />Description <br />Amount <br />1 <br />$7,795.18 <br />Grand Total: <br />$7,795.18 <br />Belsaas $ Smith Construction Inc. Titan Electrical LLC <br />103 E 4th Ave # 209 215 Keys Rd <br />Ellensburg, Washington 98926 Yakima, Washington 98901 <br />SIGNATURE <br />Titan Electrical LLC <br />DATE <br />SIGNATURE DATE SIGNATURE DATE <br />Page 1 of 1 Printed On: 2/17/2025 02:35 PM PST <br />
The URL can be used to link to this page
Your browser does not support the video tag.