My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.09.2025 PW SS Briefings
>
Meetings
>
2025
>
06. June
>
2025-06-09 1:30 PM - Public Works Study Session
>
06.09.2025 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 8:39:00 AM
Creation date
6/5/2025 3:16:17 PM
Metadata
Fields
Template:
Meeting
Date
6/9/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION: <br /> An assessment of the current sanitary sewer plant is needed to evaluate for future growth. <br /> This assessment is anticipated to be developed by outside consultants with Kittitas <br /> County Public Works oversight. Consulting would be initiated through a Request for <br /> Proposals (RFP). An assessment by the consultant will inventory the existing wastewater <br /> treatment facility through review of existing documents, plans and reports. Coordination <br /> with the District for facility records and flow records would also be needed. An analysis <br /> of the system capacity is to be developed and the hydraulic and organics loading analysis <br /> completed to support findings. A schematic of the system is to be included. The final <br /> document anticipated for this phase is a report identifying findings and recommendations <br /> for further data collection needs or actions. At this phase an analysis of the collection <br /> system is not anticipated. <br /> Public Works (PW) has technical expertise and staff to manage the project in support of <br /> Water District 6. PW would manage the RFP with District input during scoring. The <br /> District is also expected to participate in the discovery phase by making plans and <br /> documents available for review by PW and the selected consultant. Through this process <br /> it is expected to scope the current condition of the wastewater treatment plant and assess <br /> the readiness for future growth. <br /> The Conference of Governments considered this project and associated request for fund <br /> utilizing the 2025 Distressed County Sales and Use Tax (0.09 funds) for this feasibility <br /> project. Support from COG was provided at their May 21, 2025 regular meeting. <br /> FISCAL IMPACT: <br /> Up to $50,000 from the 2025 Public Facility Fund 108 (Distressed County Sales and Use <br /> Tax). <br /> ATTACHMENTS: <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.