Laserfiche WebLink
Submitting County: Kittitas <br />Project Number: 26-19-1179 <br />Project Name: Reecer Creek Rd over Towne Ditch <br />Date Approved: May 01, 2025 <br />AUTHORIZED RATA FUNDS: $841,360.00 <br />Road Number(s) <br />Road Name(s) <br />BMP(s) <br />EMP(s) Segment # <br />93526 <br />Reecer Creek Rd <br />0.76 <br />0.93 1 <br />The State of Washington County Road Administration Board (CRABoard) and Kittitas County (County) <br />mutually agree as follows: <br />(1) The funds hereby authorized are for completion of the proposed project as defined by chapter 36.79 <br />RCW Roads and bridges - rural arterial program. <br />(2) The County is in compliance with the provisions of chapter 136-150 WAC regarding eligibility for <br />Rural Arterial Trust Account (RATA) funds. If the County is found not to be in compliance with these <br />provisions, such non compliance may be cause for the CRABoard to withdraw or deny the Certificate of <br />Good Practice of the County and require pay back of any RATA funds that have been paid to the County <br />for this project. <br />(3) If the project is reconstruction, the County shall gain approval from WSDOT (chapter 43.32 RCW) for <br />all deviations from the design standards listed in the Local Agency Guidelines prior to construction. <br />(4) If the project is 3R (resurfacing restoration and rehabilitation), the County shall document its design <br />considerations for the proposed improvements in keeping with 3R standards as listed in the Local <br />Agency Guidelines. <br />(5) The project shall be constructed in accordance with the information furnished to the CRABoard, and <br />the plans and specifications prepared by the county engineer. <br />(6) Phased construction methodology is permitted upon notification by the county engineer of the <br />phasing plan as authorized under WAC 136-170-030. Failure by the county to notify the CRABoard of <br />phasing plan at least 15 days prior to commencement of construction may result in withdrawal of funding <br />by the CRABoard and county forfeiture of all RATA funds expended. <br />(7) The County shall notify the CRABoard when a contract has been awarded and/or when construction <br />has started, and when the project has been completed. <br />(8) The County shall reimburse the RATA in the event a project post audit reveals improper expenditure <br />of RATA funds. <br />(9) Costs of the project which exceed the amount of RATA funds authorized by the CRABoard, set forth <br />