Laserfiche WebLink
Scope of Work <br />Kittitas County Solid Waste 553-1763-010 <br />Ryegrass LPL and Future Uses 2 May 2025 <br />Amendment 03 <br />• Communicate and coordinate with County staff regarding drilling preparation and schedule. <br />• Drilling oversight, construction, and development of monitoring well B8. <br />The remaining items to complete include: <br />• Perform hydraulic testing of the new well and monitor nearby observation wells. <br />• Prepare a well log. <br />• Survey the well location and wellhead elevation. <br />• Develop a formal report documenting the well installation and hydraulic analysis. <br />• Project Management, meetings, and communications. <br />• Purchase and deploy a new pump in the monitoring well. <br />Additional budget is requested primarily due to the extended time it took to drill the well. <br />• Scoped assumption: 5 days of drilling oversight with one mobilization <br />• Realized drilling oversight and mobilization: 14 days of oversight and six mobilizations <br />Deliverables <br />The following list of remaining deliverables will be prepared related to the new monitoring well: <br />• Draft Monitoring Well Construction Summary Report <br />• Final Monitoring Well Construction Summary Report <br />Assumptions <br />Based on the scope we have developed the following assumptions: <br />• No additional work on the well construction is necessary. <br /> <br />Task 05 – Expansion of Biosolids Land Application Area <br />Objective <br />This task was re-opened after Ecology issued a new General Biosolids Management Permit. Work <br />completed under this task includes: <br />• Updated General Biosolids Management Permit application. <br />o New fields were not included in the permit application. <br />o The County chose not to submit the permit package prepared in February 2025 and <br />Ecology provided an extension to modify the permit to include the new additional <br />fields. <br />Additional work to complete includes: <br />• Revise the updated General Biosolids Management Permit to include the new fields.