My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment03_050925_backup
>
Meetings
>
2025
>
05. May
>
2025-05-20 10:00 AM - Commissioners' Agenda
>
Amendment03_050925_backup
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 12:04:30 PM
Creation date
5/15/2025 12:04:14 PM
Metadata
Fields
Template:
Meeting
Date
5/20/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve and Authorize the Chairman's Signature on Amendment No. 3 with Parametrix for Work at Ryegrass
Order
2
Placement
Consent Agenda
Row ID
131080
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />Kittitas County Solid Waste 553-1763-010 <br />Ryegrass LPL and Future Uses 2 May 2025 <br />Amendment 03 <br />• Communicate and coordinate with County staff regarding drilling preparation and schedule. <br />• Drilling oversight, construction, and development of monitoring well B8. <br />The remaining items to complete include: <br />• Perform hydraulic testing of the new well and monitor nearby observation wells. <br />• Prepare a well log. <br />• Survey the well location and wellhead elevation. <br />• Develop a formal report documenting the well installation and hydraulic analysis. <br />• Project Management, meetings, and communications. <br />• Purchase and deploy a new pump in the monitoring well. <br />Additional budget is requested primarily due to the extended time it took to drill the well. <br />• Scoped assumption: 5 days of drilling oversight with one mobilization <br />• Realized drilling oversight and mobilization: 14 days of oversight and six mobilizations <br />Deliverables <br />The following list of remaining deliverables will be prepared related to the new monitoring well: <br />• Draft Monitoring Well Construction Summary Report <br />• Final Monitoring Well Construction Summary Report <br />Assumptions <br />Based on the scope we have developed the following assumptions: <br />• No additional work on the well construction is necessary. <br /> <br />Task 05 – Expansion of Biosolids Land Application Area <br />Objective <br />This task was re-opened after Ecology issued a new General Biosolids Management Permit. Work <br />completed under this task includes: <br />• Updated General Biosolids Management Permit application. <br />o New fields were not included in the permit application. <br />o The County chose not to submit the permit package prepared in February 2025 and <br />Ecology provided an extension to modify the permit to include the new additional <br />fields. <br />Additional work to complete includes: <br />• Revise the updated General Biosolids Management Permit to include the new fields.
The URL can be used to link to this page
Your browser does not support the video tag.