My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit D for PSA
>
Meetings
>
2025
>
05. May
>
2025-05-20 10:00 AM - Commissioners' Agenda
>
Exhibit D for PSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 12:04:15 PM
Creation date
5/15/2025 12:03:38 PM
Metadata
Fields
Template:
Meeting
Date
5/20/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Professional Services Agreement with ALSC Architects
Order
4
Placement
Consent Agenda
Row ID
131080
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />ASSUMPTIONS AND QUALIFICATIONS OF PROPOSAL <br />1.Due to the preliminary nature of the available information,DCI’S fees are <br />primarily based on the project type,perceived complexity,and gross square <br />footage of the building.If substantial changes are made to this concept,DCI may <br />be entitled to additional fees. <br />2.DCI assumes a geotechnical study will be made available before design <br />commences.The report should include a description of soil types,condition, <br />stability,bearing capacity,seismic site class,and groundwater conditions.The <br />report should also provide recommendations for structural design criteria and <br />subgrade preparation. <br />3.The Primary Structural Frame will be designed to support typical mechanical, <br />electrical,plumbing,fire protection and building maintenance equipment.Delay <br />or late selection of these systems may require additional fees if structural design <br />modifications are required.Design of seismic bracing or anchorage for any of the <br />MEP or fire protection systems are not included,but may be provided as an <br />Additional Service. <br />4.Our Construction Administration fees do not cover the correction of construction <br />errors or design changes made after the start of construction. <br />SUMMARY OF STRUCTURAL ENGINEERING FEES <br />Engineering services will be billed monthly on a fixed fee basis unless otherwise <br />noted below.Fixed fees are billed on a percent-complete basis and hourly services <br />will be billed according to DCI’s attached Schedule of Expenses. <br />DCI reserves the right to review and revise all design fees for any proposal accepted <br />more than 90 days after date of submission,and to review and revise all <br />Construction Administration fees for any project where construction starts more <br />than one (1)year after commencement of design. <br />PRIMARY STRUCTURAL <br />SERVICES <br />_____ <br />FEE FEE TYPE <br />100%Design Development $12,400 Fixed Fee <br />(Complete from 50%DD) <br />Construction Documents $28,500 Fixed Fee <br />Bidding $1,850 Fixed Fee <br />Construction Administration $24,800 Fixed Fee <br />Project Closeout (Includes As $1,850 Fixed Fee <br />Built Drawings) <br />Direct project reimbursable expenses include in-house production plotting, <br />reprographic services,courier costs,and travel expenses.These will be billed at 1.10 <br />times the direct cost as noted on the attached Schedule of Expenses. <br />Washington I Oregon I California I Texas IAlaska I Colorado I Montana I Delaware <br />I <br />Pennsylvania
The URL can be used to link to this page
Your browser does not support the video tag.