Laserfiche WebLink
A ri 601 W First Aye,Ste 1300 <br />Spokane,WA 99201,USA <br />%‘1’Engineers 509.838.9020 <br />mwenglneers.com <br />6.Significant delays between design phases can result in inherent design inefficiencies,code changes,project <br />construction costs and even programmatic changes.Should the project be significantly delayed and <br />resurrected,we assume that this fee would be renegotiated. <br />7.Construction administration includes up to (6)2-person trips to the site including punch list and back check <br />of punch list.Should phasing and construction sequencing stretch beyond this period,the fee would be <br />renegotiated. <br />8.Services are based upon a single bid package for a single General Contractor. <br />9.Professional services will be billed during design and construction administration as indicated in the Basic <br />Services and Potential Supplemental Services Tables. <br />FEE EXCLUSIONS: <br />1.Services not specifically listed in this proposal. <br />2.Value engineering,commissioning,constructability review,conformed documents. <br />3.LEED participation and documentation. <br />4.Mechanical/civil utilities more than 5 feet outside the building. <br />5.Fire protection design. <br />6.Security design. <br />7.Audio Visual design. <br />8.Solar PV design and Electric Vehicle Charging design. <br />9.Sports lighting design.Relocation of existing sports lighting is included in base lighting services. <br />10.Wireless access network design. <br />11.Acoustic analysis or acoustical engineering,If the project has sound criteria,it is assumed that the project <br />team will have an acoustician that we collaborate with in the design phase. <br />12.Permitting agency fees. <br />Thank you again for including MW Engineers on this exciting project!Please do not hesitate to reach out to me <br />with any questions. <br />Sincerely, <br />Joel Enevold,PE <br />Principal,Electrical Systems <br />Page 4 of 4