Laserfiche WebLink
identified and <br />evaluated <br />•EEMs considered but disqualified <br />•Recommendations to improve existing system and <br />operating conditions <br />facility <br />improvement <br />measures <br />Cost, savings <br />•Maximum allowable project cost <br />11/15/2025 <br />Anticipated costs, <br />and financing <br />•EEM savings projections <br />savings, <br />•Finance resources <br />incentives <br />Construction/ <br />•Proposed retrofit schedule and workplan <br />12/30/2025 <br />Schedule, <br />Post <br />•Detailed measurement and verification plan <br />workplan for <br />construction <br />implementation <br />1.2 Consultant's/Contractors Responsibilities <br />The selected Consultant will be required to assume responsibility for all services outlined <br />in the proposal whether the Consultant or their representative produces them. The <br />Consultant's person -in -charge of the project must have the experience necessary to <br />complete the tasks outlined above. <br />The consultant/contractor must provide Professional Liability Insurance: <br />The Contractor and/or its Subcontractor and/or its consultant providing professional <br />services shall provide evidence of Professional Liability Insurance covering <br />professional errors and omissions. Such policy must provide the following minimum <br />limits: <br />$1,000,000 per claim <br />$2,000,000 annual aggregate <br />If insurance is on a claims -made form, its retroactive date, and that of all <br />subsequent renewals, shall be no later than the effective date of the Agreement. <br />4of8 <br />