Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #21 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 0 6,830.00 0 0 <br />OVERHEAD 3%0.00 204.90 0 0 <br />PROFIT 10%683.00 <br />BONDING 1.5%102.45 <br />SUB TOTAL 0 7,820.35 0 0 <br />SUB TOTAL 0 7,820.35 0 0 <br />LABOR 0 <br />MATERIAL 0 <br />EQUIPMENT 0 <br />SUBCONTRACTORS 7,820.35 <br />SUB TOTAL SUB TOTAL 7,820.35 <br />GRAND TOTAL TOTAL 7,820.35 <br />TIME EXTENTION REQUIRED:0 <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT.