Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #21 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTSEQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST <br />LVTS - Data and Fiber <br />Data & Fiber Additive 1 LS 0.00 6,830.00 0 <br />0.00 0 0 <br />0.00 0 0 <br /> 0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />*TOTALS 0 6,830.00 0 0