Laserfiche WebLink
BELSAAS <br />8[ <br />SMITH <br />BELSASC0330H <br />December 3rd, 2024 <br />Re: Deductive Change Order #01 <br />P.O. BOX 926 / 103 EAST 4" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@beismith.com <br />Per the description below, we are pleased to offer the following change order proposal #1 <br />(COP#1). <br />COP#01 includes the cost deduction to delete the relocation of the three electrical vaults and <br />replace the concrete encasement of the road crossings with sand. <br />Total deduction to be implemented into the contract: $-13,389.88 <br />Time extension required: 0 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />