My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
2025-02-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:10:42 PM
Creation date
2/27/2025 12:08:22 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
128215
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />STAFF REPORT <br />Solid Waste <br />SPECIAL MEETING DATE: February 11, 2025 <br />TOPIC: Change Order No. 2 <br />ACTION REQUESTED: Board's Signature on Change Order No. 2 <br />LEAD STAFF: Patti Stacey, Director <br />RECOMMENDATION: Recommend Boards Signature on Change Order Number 2 with <br />Belsaas and Smith Construction, Inc. <br />BRIEFING SUMMARY: We have completed the review of Change Order Proposals <br />(COP) #01, COP #02, and COP #10. These proposals have been incorporated into <br />Change order No. 2 and are ready for the Board's signature. <br />BACKGROUND: On September 3, 2024, the Board of County Commissioners approved <br />a resolution to award the bid for the Lower County Transfer Station to Belsaas and Smith <br />Construction, Inc. <br />DISCUSSION: Change Order Number 2 is for items that were changed from the original <br />bid (increased louver size), items missing in the original bid documents (removal of <br />additional fencing), and value engineering (deletion of the need to relocate electrical <br />vaults, and a change to the perimeter fence slats). <br />FISCAL IMPACTS: Net reduction in contract cost of $11,754.08 before Washington <br />State Sales Tax <br />ATTACHMENTS: Change Order No. 2, COP #01, COP#02, COP# 10 <br />Legal consultation - No <br />Finance consulted - No <br />Page 1 of 1 <br />Solid Waste "Special Meeting Staff Report", 2/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.