2021 <br /> Improvements were completed along the North Fork Teanaway Road at mile post 1.36.This removed the <br /> 36-inch CMP and 54-inch RCP and constructed a 40-ft precast concrete structure, Bridge no. 16301. <br /> Stream channel work was also completed to realign the channel into the historic pathway. <br /> 2020 <br /> An old 48 in.arch culvert on Bender Road over Whiskey Creek was replaced with a new three-sided precast <br /> box culvert by a land development company.The structure was placed in 2019 and paving and guardrail <br /> construction were completed in 2020. <br /> Vantage Highway over Coleman Creek Bridge No. 89332 is a new pre-cast 27 foot long flat slab bridge <br /> that replaced two existing culverts, a CMP culvert, and a concrete box culvert. The removal of the two <br /> culverts was initiated by Washington Department of Fish and Wildlife to eliminate the existing fish barrier. <br /> With a portion of this project being sponsored by the Brian Abbot Fish Barrier Removal Board, <br /> construction began in Sept. 2020 and concluded in Oct. 2020. <br /> A new structure installed on Fairview Road over Coleman Creek #89146 (OB), replaced #89141 (OB), <br /> #89142 (OB)and#89144(OB).The project removed three existing box culverts and replaced them with a <br /> single 18 ft. precast box culvert.The structure, creek realignment and road widening were all completed <br /> in 2020.The driving surface will be .20 ft. of HMA installed by County forces in 2021. <br /> Big Boulder Creek#34350 is a 60 foot prefabricated modular steel bridge that replaced structure FLTPSI <br /> on Forest Service Road 4330 that was load restricted and had a compromised foundation. In 2019 Kittitas <br /> County Public Works placed a temporary 40 foot bridge to bypass the structurally compromised structure, <br /> and returned in 2020 to install the permanent 60 foot bridge and retrieve the temporary 40 foot bridge. <br /> 2019 <br /> An old culvert on Teanaway Road#06051-(OB) spanning Story Creek was replaced with a new four-sided <br /> 19 ft. box culvert,#06052-(OB). Work was completed in October of 2019. <br /> Manastash Road Bridge #76131 replacement project was completed in the spring of 2019, with Bridge <br /> #76132.The 70 foot bridge deck is covered with a waterproof membrane. The deck and approach slabs <br /> are covered with 0.25 in. of HMA. <br /> No. 6 Rd #79051-(OB) replacement was completed in the spring of 2019. The new structure #79052 <br /> consists of 15 in. deep precast concrete slab units.The driving surface is a 3 in. reinforced concrete deck, <br /> 32 ft.wide. <br /> 2018 <br /> University Way Road Bridge#88341 over BNRR was repaired by a contractor, Belsaas and Smith.The work <br /> consisted of constructing approach slabs, concrete substructure repairs, minor drainage modifications, <br /> and other work.This work was completed during the summer of 2018. <br /> 2017 <br /> Bar 14#89041 was reduced to single lane traffic after spring flooding caused debris buildup at the bridge. <br /> After consultants inspected the bridge, it was found to be functionally obsolete from a hydraulic <br /> standpoint.The bridge was then removed in October. <br /> Kittitas County 2024 Annual Bridge Report <br />