My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
02. February
>
2025-02-18 10:00 AM - Commissioners' Agenda
>
2025-01-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 12:10:17 PM
Creation date
2/13/2025 12:04:23 PM
Metadata
Fields
Template:
Meeting
Date
2/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
127511
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!? <br />Kittitas County Solid Waste/ Facilities On -Call <br />SCJ ALLIANCE December 12, 2024 <br />Page 3 of 4 <br />payment, and issue the final contract voucher. Prepare and stamp Record Drawings. Submit to the <br />City digitally as PDF files. <br />6.1 Prepare contract punchlist, releases, and completion letters. <br />6.2 Prepare and submit record drawings <br />Deliverables: <br />• Full Full-size and half-size paper record drawings, and electronic PDF files electronically. <br />Sub Task 7 — Materials Testing Services by Subconsultant — Field and laboratory testing od soils, aggregates, <br />HMA and concrete. Acceptance testing for concrete (compressive strength, slump and air content), HMA <br />(compaction, gradation and oil content), soil and crushed rock (compaction, gradation, fracture and sand <br />equivalent). <br />Phase 8 RV Park Feasibility Study <br />This amendment includes additional services for further evaluating the proposed RV Park at the Kittitas County <br />Event Center <br />Task- 1 Feasibility Study <br />The previous scope of work for feasibility was fulfilled and we are continuing services. This amendment <br />extends the management and due diligence of advancing the RV Park concept. These extended services <br />include the following: <br />1) Coordination with the survey team. <br />2) Process survey documents for the surveyor. <br />3) Re -align the layout to the existing conditions. <br />4) Assess impacts and changes. <br />5) Meeting with the Client to understand changes. <br />6) Update layout based on Clients feedback. <br />7) Develop a spending plan for current funding to be obligated by May 2025. <br />8) Coordination with the City to relocate electrical around the project site. <br />9) General project coordination and senior reviews of deliverables. <br />10) Continued billing/invoicing (6 months) <br />Task 2 Topographic Survey <br />1) See Cruse and Associates' scope of work and fee estimate. <br />?5 N V%Jenaichee A!,e, 5uite'_38 4 Wenatchee, l;VA 98801 ~ Office S09.886,3265 Fax 360.352A.S09 scialhance.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.