My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.10.25 PW SS Briefings
>
Meetings
>
2025
>
02. February
>
2025-02-10 1:30 PM - Public Works Study Session
>
2.10.25 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 8:41:10 AM
Creation date
2/6/2025 3:39:41 PM
Metadata
Fields
Template:
Meeting
Date
2/10/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projects for the Safety Plan are identified by compiling fatal and serious injury crash data <br /> provided by WSDOT as well as an analysis of the infrastructure around incident sites <br /> including safety features, signage, pavement conditions, road geometry, and drainage. <br /> Projects are developed utilizing this strategy and ranked by county staff on several <br /> conditions. <br /> DISCUSSION: <br /> Through analysis of this data, Public Works anticipates this year's Safety Plan to include <br /> the following: <br /> Kittitas Hwy at No. 6 Road Intersection Improvements. Public Works has made <br /> several incremental improvements at the intersection over the last few years, but the <br /> criteria(specifically crashes in the last 5 years) evaluated in the Safety Plan still identifies <br /> a need at this location. This project would identify a large-scale capital improvement <br /> project at the intersection. <br /> Huntzinger Guardrail Phase 2. Public Works is currently in the design phase for <br /> guardrail improvements on the first phase of improvements addressing approximately <br /> half of the road segment. This project would look to fund the remaining road segment. <br /> Corridor Improvements Countywide. The compiled data shows a trend of serious <br /> accidents which happen on certain high-volume roads throughout the County including <br /> Look Road,Hanson Road, Cove Road, Bullfrog Road, etc. which could be mitigated with <br /> minor improvements to the corridor. Improvements may include embedded LED <br /> markers, roadway edge-line rumble strips, and/or carsonite delineation markers to <br /> enhance visibility. The low cost of these improvements makes bundling several projects <br /> together an option for addressing several high-risk areas at once. <br /> Denmark Road Corridor Improvements. Denmark Road from Tjossem Road to Fourth <br /> Parallel Road has several safety concerns including narrow structures, non-compliant <br /> horizontal and vertical curve, and drainage concerns. This project would address all <br /> identified safety risks within this corridor. <br /> Bridge and Structure Improvements. Throughout the County there are numerous <br /> bridges and structures with identified safety concerns including unprotected side slopes <br /> and narrow lane widths. This project may include a County Wide evaluation of existing <br /> structures, as well as an implementation phase to address the safety concerns specifically. <br /> Public Works intends to present the complete Safety Plan for adoption at the regular <br /> Agenda session on March 4, 2025, in order to submit applications for funding by the <br /> March 15, 2025, deadline. <br /> FISCAL IMPACTS: <br /> Previous HSIP projects have been authorized for 100%Federal Funding if the County <br /> obligates the construction funding within approximately 2.5 years of award. <br /> Page 2 of 2 <br /> Public Works"Work Session Staff Report",2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.