My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.10.25 PW SS Briefings
>
Meetings
>
2025
>
02. February
>
2025-02-10 1:30 PM - Public Works Study Session
>
2.10.25 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 8:41:10 AM
Creation date
2/6/2025 3:39:41 PM
Metadata
Fields
Template:
Meeting
Date
2/10/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br /> DEPARTMENT OF PUBLIC WORKS <br /> PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS <br /> STUDY SESSION STAFF REPORT <br /> STUDY SESSION DATE: February 10,2025 <br /> TOPIC: Safety Plan Briefing <br /> ACTION REQUESTED: No Action Required <br /> LEAD STAFF: <br /> Cameron Curtis, County Engineer <br /> RECOMMENDATION: <br /> No Action Required <br /> BRIEFING SUMMARY: <br /> • Public Works Local Road Safety Plan is updated biannually. Counties must <br /> submit a local road safety plan that addresses fatal and serious injury crashes to be <br /> eligible to apply for the Highway Safety Improvement Program call for projects. <br /> (HSIP) <br /> • The Local Road Safety Plan identifies projects utilizing crash data,pavement <br /> management data,and previous Safety Plan details. The plan must identify and <br /> prioritize improvements/countermeasures to address the highest priority locations, <br /> while also documenting how and why the priorities were selected. <br /> • Currently Public Works is utilizing 2023 HSIP funding for Huntzinger Road <br /> Guardrail Phase 1 and Horizontal Curve County-Wide Data Collection. <br /> • Public Works anticipates the following projects to be included in the upcoming <br /> Safety Plan: <br /> o Kittitas Hwy at No. 6 Road Intersection Improvements <br /> o Huntzinger Guardrail Phase 2 <br /> o Corridor Improvements Countywide <br /> o Denmark Road Corridor Improvements <br /> o Bridge and Structure Improvements <br /> • HSIP Funding applications are due by March 15, 2025. Public Works intends to <br /> present the final Safety Plan at a regular Agenda session on March 4,2025. <br /> BACKGROUND: <br /> The Washington State Department of Transportation(WSDOT)administers federal <br /> funding for safety improvements through the Highway Safety Improvement Program <br /> (HSIP). WSDOT has issued a call for projects for the upcoming biennium,with <br /> applications due by March 15, 2025. Every other year Public Works is required to update <br /> the Kittitas County Local Road Safety Plan to qualify for the funding. Currently,Public <br /> Works is utilizing this funding source for the Huntzinger Guardrail Phase 1 and the <br /> Horizontal Curve County-Wide Data Collection projects. <br /> Page 1 of 2 <br /> Public Works"Work Session Staff Report",2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.