My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2025-001
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
Ordinance 2025-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 12:57:21 PM
Creation date
1/13/2025 12:56:39 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utility installation, cleaning of drainage system, edge restoration, seeding, planting, and allnecessary clean-up in accordance with the approved plans and these standards. <br />3' Additional Requirements: Prior to final approval of construction work, acceptance formaintenance and release of construction performance bonds, the developer/contractor <br />shall pay any required fees, submit any required maintenance and defect financialguarantees, provide certification of monumentation and submit one mylarset ofcorrected plans (as-built) reflecting all minor and design plan changes of the roadway anddrainage systems. The Department of Public work shall specifu the number of mfa+setsas warranted by the type of improvement <br />@lforiginatplanswerecompletedonaCADDsystem'the <br />developer/contractor shall submit, in addition to myrars ph[sical plans. , .opy of theCADD drawing files in.DWG format. <br />M. Final Maintenance lnspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2' lnspection Details: overall check of work associated with a maintenance guarantee. <br />3' Additional Requirements: Prior to release of the maintenance guarantee, there shall besuccessful completion of the maintenance period as described Kcc 12.o1.oga,repair ofany failed facirities and the payment of any outstanding fees. <br />1 2.05.02.080 Structure lnspections. <br />The following shall apply to the construction inspection of all bridges and major drainage structures: <br />A' All materials and construction activity, and testing thereol shafl conform to the current edition ofthe WSDOT Standard Specifications, as amended. <br />B' Prior to construction, the county Engineer shall hold a pre-construction meeting with theapplicant's structural engineer to review the required inspections and documentation. <br />c' The applicant's structuralengineer shall be responsible for inspection, material testing, qualitycontrol. and sufficiency of the completed structure. <br />D' All inspection activities and methods shatl be subject to approval by the county Engineer. <br />E' lnspection and testing shall be conducted at the direction of the applicant,s structural engineer asfrequently as necessary to ensure the construction conforms to the approved plans andspecifications. <br />10, <br />Title 12 Kittitas county code I Draft No. 5 - working Draft for Adoption 10/12/2023
The URL can be used to link to this page
Your browser does not support the video tag.